HomeMy WebLinkAboutCapital Improvement Program Adopted FY 2011-2012CITY OF MOUNTAIN VIEW MEMORANDUM DATE: August 29, 2011 TO: City Council FROM: Daniel H. Rich, City Manager Michael A. Fuller, Public Works Director Linda Forsberg, Transportation and Business Manager Jerry Burgess, Senior Administrative Analyst SUBJECT: ADOPTED FISCAL YEAR 2011 -12 CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM DEVELOPMENT AND APPROVAL PROCESS The FY 2011 -12 Capital Improvement Program (CIP) (Attachment 1) was adopted by the City Council on June 7, 2011 after being reviewed at a Study Session on April 19, 2011. Funding for FY 2011 -12 projects was approved as part of the adoption of FY 2011 -- 12 budgets on June 14, 2011. In 2005, the City Council established a two -year CIP cycle as a streamlining measure to reduce the amount of City Council and staff time needed for the development and approval of the CIP. FY 2011 -12 is the second year of this biennial planning cycle and, consequently, there was no broad call for new projects. ADOPTED FY 201112 CAPITAL IMPROVEMENT PROGRAM The slow pace of economic recovery at the national, State and local levels continues to limit City resources to fund the CIP. Because the CIP Reserve and Construction/ Conveyance Tax (C /C Tax) Funds continue to be constrained, departments were instructed to limit their proposals to projects that are required to address health/ safety concerns and comply with regulatory requirements, are urgently needed to repair/ replace broken infrastructure, respond to Council priorities and /or will generate operational savings or revenue. On a more positive note, gas tax revenues are anticipated to be slightly higher and more stable in FY 2011 -12 and the corning years. The City also expects to receive an additional $350,000 for streets projects annually starting in FY 2012 -13 as a result of the passage of Measure B in November 2010 which raised vehicle registration fees by $10 per year. City Council August 29, 2011 Page 2 Projects to Close Staff reviewed the status of all active capital projects to determine which projects could be closed at the end of FY 2010 -11, so unspent balances could be reprogrammed to upcoming capital projects. This effort resulted in approximately $3.2 million being returned to five important CIP funding sources: C/C Tax Fund ($340,000), Water Fund ($1.5 million), Wastewater Fund ($900,000), Shoreline Community Fund ($325,000), and Park Land Dedication Fund ($400,000). Attachment 2 provides a listing of projects closed at the end of the 2010 -11 fiscal year. Active projects that will remain open are shown in Attachment 3. Nondiscretionary Annual and Periodic Infrastructure Maintenance Projects The Five -Year CIP adopted by Council in May 2010 envisioned reduced funding for some nondiscretionary annual and periodic maintenance projects starting in FY 2011 -12 (Attachment 4). In developing the funding reduction strategy, staff took great care to maintain funding for projects that relate to safety concerns (e.g., traffic signal replacements and modifications) and projects that, if not done as scheduled, will cost the City more for repair/ replacement in the future (e.g., streets projects). The reductions are included in the Adopted FY 2011 -12 CIP. Funding for one annual infrastructure maintenance project, Water Main /Service Line Replacements, has been increased by $250,000 in FY 2011 --12 as part of a strategy to gradually increase annual expenditures on water main replacements by approximately $1.0 million per year based on recommendations in the recently completed Water System Master Plan. Attachment 5 provides additional information regarding the key findings of both the Water and Sewer Master Plans. Increased investments in the City's water system are being phased in because of the impact this spending has on water rates. This is of particular concern in FY 2011 -12 given the San Francisco Public Utilities Commission's (SFPUC's) 38 percent increase in wholesale water rates. Attachments 6 and 7 provide additional information regarding two other annual nondiscretionary infrastructure projects — Attachment 6 provides detailed information about Information Technology projects to be funded in FY 2011 -12 and Attachment 7 provides an overview of energy conservation projects funded by previous annual energy conservation CIPs. City Council August 29, 2011 Page 3 Amendments to Previously A roved Projects The Adopted C1P funds a number of amendments to existing projects so that progress on these projects can continue in FY 2011 -12. Permanente Trail Charleston Road Undercrossing Feasibility Study, Project 09 -26 Current Funding $200,000 Funding Modification 80,000 Revised Funding $28 Funding Sources Shoreline Community Shoreline Community ($20,000); C/C Tax ($60,000) The existing scope of this project is to study the feasibility of a pedestrian undercrossing on the Permanente Creek Trail at Charleston Road. With the anticipated completion of the Permanente Creek Trail pedestrian overcrossing of Highway 101, the adopted C1P provides increased funding to study two additional challenges along the trail, including extending the Trail from Rock Street to Middlefield Road and evaluating the existing undercrossing at Amphitheatre Parkway for compliance with the Americans with Disabilities Act (ADA). There will be efficiencies associated with having the same engineering firm perform all three studies, and completing the study of Rock Street to Middlefield Road will put the City in a better position to receive trail grants for design and construction. Funding for this amendment will be provided from the Shoreline Community Fund ($20,000) and C/C Tax ($60,000). Rengstorff Avenue Grade Separation /High -Speed Rail Coordination, Project 09 -28 Current Funding $350,000 Funding Modification (250,000) 250,000 Revised Funding $35 Funding Sources Gas Tax ($250,000); C/C Tax ($50,000); Downtown Revitalization Authority ($50,000) Gas Tax C/C Tax The scope of Project 09 -28 was originally the environmental review of the Rengstorff Avenue railroad grade separation. As a street- related project, it was City Council August 29, 2011 Page 4 funded with Gas Tax funds ($250,000). On March 23, 2010, Council amended Project 09 -28 by authorizing $100,000 ($50,000 from C/C Tax and $50,000 from Revitalization Authority) for urban design services related to the California High - Speed Rail project. Because Project 09 -28 is now funding the City's high -speed rail coordination efforts rather than the Rengstorff Avenue grade separation environmental study, the project is no longer eligible for Gas Tax funding. The adopted C1P replaces the Gas Tax funds with C/C Tax funds. The total amount of funding in Project 09 -28 remains unchanged. San Ramon Avenue Reconstruction, Project 09 -46 Funding, Sources Current Funding $650,000 Proposition 1B State Bond Funding ($639,000); State Grant Funding ($11,000) Funding Modification (650 000 Revised Funding -0-- San Luis Avenue Reconstruction Project 11 -30 Funding Sources Current Funding $ 570,000 Gas Tax ($520,000); C/C Tax ($50,000) Funding Modification 500,000 Proposition 1B State Bond Funding ($639,000); State Grant Funding ($11,000); Gas Tax (-- $150,000) Revised Funding $1 _p7 San Ramon and San Luis Avenues are two of the Rex Manor neighborhood streets that are slated for complete reconstruction due to poor pavement condition. These amendments combine the two streets into one project to achieve economy of scale and, likely, lower construction costs. This amendment also returns $150,000 to the Gas Tax Fund because, based on the current cost estimate, the combined project is well within budget. City Council August 29, 2011 Page 5 • 2010 -11 Traffic Signal and Streetlight Pole Replacements/ Modifications Project 11 -02 Funding Sources Current Funding $210,000 C/C Tax Funding Modification (25,000) C/C Tax 25,000 Shoreline Community Revised Funding $UUW A recent signal controller replacement at the corner of Amphitheatre Parkway and Charleston Road ($25,000) is eligible for funding from the Shoreline Community Fund. This amendment replaces C/C Tax funding with Shoreline Community funds and does not increase total project funding. • Information Technology Computer Projects, Project 10 -18 Current Funding $506,000 Funding Modification 75 000) Revised Funding $43 Funding Sources C/C Tax ($190,000); Water Fund ($125,000); Wastewater Fund ($125,000); Solid Waste Fund ($33,000); Shoreline Community ($33,000) C/C Tax Information Technology Computer Projects, Project 11 -18 Funding Sources Current Funding: $500,000 C/C Tax ($150,000); Water Fund ($15,000); Wastewater Fund ($15,000); Building Services ($200,000); Shoreline Community ($120,000) Funding Modification 75,000 C/C Tax ($75,000) Revised Funding $575 000 City Council August 29, 2011 Page 6 Prior to this fiscal year, funding for the permit tracking system existed in two projects (Projects 10 -18 and 11 -18). This amendment combines the funding by transferring $75,000 of C/C Tax from Project 10 -18 to Project 11 -18 to simplify project administration. Burgoyne Street Reconstruction, Project 09 -40 Current Funding $1,227,000 Funding Modification (35,000) Revised Funding $1 1 2 00 Funding Sources CIP Reserve ($800,000); Proposition 1B State Bond Funding ($386,000); State Grant Funding ($41,000) CIP Reserve ($35,000) The Burgoyne Street Reconstruction Project is complete, and $35,000 of CIP Reserve funding was not used. The adopted CIP reduces funding in Project 09 -40 and transfers the unused CIP Reserve funds to a new project, Middlefield Road Median Islands Reconstruction, Easy Street to Shoreline Boulevard, Project 12 -32. Detailed information regarding Project 12 -32 is provided in the New Discretionary Projects section of this memorandum. 10 -11 Annual New Energy Conservation Measures, Project 11 -26 Funding-Sources Current Funding $160,000 C/C Tax Funding Modification 11,000. Other (PG &E) Revised Funding $17 The City received an $11,000 energy efficiency incentive payment from PG &E for the Community Center and Rengstorff Park lighting improvements paid for by CDBG funds. This amendment reinvests the payment into the FY 2010 -11 capital project to fund additional energy conservation activities during FY 2011 -12. City Council. August 29, 2011 Page 7 "Roll-Forward" Discretionary Projects The Adopted FY 201112 CIP includes three "roll- forward" discretionary projects as follows: Vassar Avenue Reconstruction, Construction, Project 12 -30 ($400,000) -- Vassar Avenue is another Rex Manor street slated for reconstruction of curbs, gutters, driveway approaches and pavement. The current pavement condition index (PCI) rating for this street is 26 (poor condition). This project continues a street improvement strategy started in the FY 2007 -08 CIP to reconstruct 10 residential streets along Burgoyne Street between San Ramon Avenue and Hackett Avenue. This project is funded from the Gas Tax ($365,000) and C/C Tax ($35,000) Funds. Funding for the design phase of the Vassar Avenue Reconstruction Project was approved last year in Project 11 -31, Vassar Avenue Reconstruction, Design ($180,000). Crittenden Park (West Field) Turf Replacement, Design and Construction, Project 12 -33 ($1,485,000) —This project will convert the Crittenden Field to synthetic turf to increase the field's playing capacity, decrease maintenance costs, conserve water and limit the use of fertilizers and pesticides. This project is funded by the Park Land Fund. Work on this project will not begin before a Study Session to discuss the use of artificial turf at City park sites is held later this fall. Microfiche to Digital Imaging Conversion, Project 12--37 ($460,000) —This project includes conversion of existing Building Division records stored on deteriorating microfiche to a searchable digital imaging system. The project provides technology that will improve the public's and staff's ability to quickly and easily access document images at multiple computers instead of having to use a single, aging and time - intensive microfiche reader and printer. This project is funded from the Building Services Fund. A fourth project, Project 13 -30, South Whisman Area Park Design, was scheduled to roll forward for funding in FY 2011 -12 but will be delayed one year (until FY 2012 -13) because of a delay in the development of new housing in the South Whisman Precise Plan Area. The project to construct the new park, Project 14 -29, South Whisman Area Park Construction, has been rescheduled to FY 2013 -14. New Discretionary Projects The Adopted FY 2011 -12 CIP includes a number of new projects that reflect department and Council priorities within the limited parameters discussed earlier in this report. City Council August 29, 2011 Page 8 Police /Fire Administration Building Refurbishment, Project 12 -28 ($450,000) —This project includes repair/ refurbishment of many old or original features in the 30 -year old Police /Fire Administration Building to provide short -term relief for building occupants and visitors until a strategy to meet the long -term space needs of the Police and Fire Departments is finalized. Improvements include remodeling and /or modernizing several areas within the building to make more efficient use of space, improving building safety, and updating some areas that are still original and beyond their useful lives, including the Emergency Operations Center (EOC). This project is funded from the C/C Tax Fund. Mechanical System Replacement at Eagle and Rengstor£f Pools, Project 12 -29 ($780,000)— Replacement of mechanical systems at Eagle and Rengstorff Pools to address critical health and safety issues associated with the operation of public swimming pools. This project is funded with C/C Tax Fund. Induction Lighting Replacements, Phase 1, Project 12 -31 ($700,000) —The Adopted CIP funds the first phase of converting the City's existing 3,200 high- pressure sodium (HPS) streetlights to induction lighting, starting in FY 2011 -12. Phase 1 will focus on installing the new, energy - efficient lighting along high - traffic roadways and in the City's North Bayshore Area (approximately 1,600 lights). Material and installation costs are proportionally funded by the C/C Tax ($630,000) and Shoreline Community ($70,000) Funds. Phase 1 is expected to yield $72,000 in annual energy savings and a reduction of 171 metric tons in GHG emissions. The estimated simple payback for Phase is approximately 7.9 years. The conversion of the remaining lighting in the City's residential areas (1,600 additional lights) will be proposed in subsequent CIPs. Middlefield Road Median Islands Reconstruction, Easy Street to Shoreline Boulevard, Project 12 -32 ($780,000) —This project includes reconstruction of median island curbs, installation of striping and pavement markings, installation of median pavers and mowing strip, and associated miscellaneous improvements on Middlefield Road between Easy Street and Shoreline Boulevard. As a result of successive overlays that have occurred over many years, the median curb protecting traffic from the median island ranges from 0" to 3" as compared to the standard 6" curb height. In some locations, the roadway is elevated above the existing median curbs. Replacing the median curb and roadway markings will signal drivers and prevent vehicles from entering onto the median and avoid colliding with trees and other landscaping in the median. Existing landscaping in the median will not be affected. On March 1, 2011, the project was awarded $652,500 in Federal funding as part of the Highway Safety Improvement Program City Council August 29, 2011 Page 9 (HSIP) administered by Caltrans. The remainder of project funding will come from unused CIP Reserve funding from the Burgoyne Street Reconstruction project ($35,000) and from C/C Tax funding ($93,000). Parks and Trails Maintenance Projects, Project 12 -34 ($124,000) Stevens Creek Trail /Evelyn Avenue /Central Expressway Landing Area — The landing areas on each side of the Stevens Creek Trail Bridge over Central Expressway consist of wooden planks that are deteriorated and slippery when wet. This project will remove the wooden planks and install a concrete slip - resistant surface. The project scope also includes a curb cut at the end of Stevens Creek Trail at Evelyn Avenue to allow easier access for bicyclists. These improvements are funded from the Shoreline Community Fund ($18,000) and the C/C Tax Fund ($53,000). Shoreline Sailing Lake Dock Replacement — Replacement of six sections of the concrete floating docks at the Shoreline at Mountain View Sailing Lake. These sections have significant cracks and /or crumbled edges that pose a potential safety hazard to staff, customers and summer camp participants. Shoreline Community funds ($27,000) will fund this project. - Skate Park Modifications —This project provides for modifications to the existing Skate Park facility in Rengstorff Park. Funding is provided by the Park Land Dedication Fund ($24,000) and C/C Tax ($2,000). Permanente Creek Trail: Old Middlefield Way to Rock Street, Project 12 -35 ($330,000) --This project will extend the Permanente Creek Trail from Old Middlefield Way, where the trail, will end after completion of the pedestrian overcrossing of Highway 101 early next year, to Rock Street. The City has already received a $100,000 Transportation Fund for Clean Air (TFCA) grant for the project, but was unsuccessful in securing a Clean, Safe Creek and Open Space grant from the Santa Clara Valley Water District for the project. Staff will seek other grant opportunities to fully fund the project. Park Land Dedication Funds ($187,000) have also been approved for this project. This funding may be used if the City does not receive sufficient grant funds to fully fund the project. Rock Church Interim Use and Conversion, Project 12 -36 ($500,000)-- Placeholder amount for the refurbishment /modification of the Rock Church building to support interim use. The project may also be a candidate for Community City Council August 29, 2011 Page 10 Development Block Grant (CDBG) funding that will become available in July 2012. This project will be funded with Park Land Dedication Funds. Alignment /Constructability Study for Utility Crossing Replacements at Highway 101 and Highway 85, Project 12 -38 ($134,000) —There are several water and sanitary sewer mains crossing Highways 101 and 85 that will need to be replaced in the near future. Realignment of the pipelines may be less costly than replacing them in the current alignments and may also facilitate keeping the existing mains in service during construction. This project funds preliminary engineering services to determine the best alignment and construction methods for replacement of these mains. Based on the results of this preliminary engineering study, staff would prepare cost estimates and propose projects in upcoming CIPs for replacement of the pipelines. Funding will be provided by $67,000 each from the Water Fund and Wastewater Fund, Landfill Infrastructure Master Plan Study, Project 12 -39 ($250,000) - -This project will evaluate the City's closed landfill and is part of the ongoing analysis of funding needs in the Shoreline Community. The evaluation will include assessment of the condition of existing infrastructure and identification of deficiencies, analysis of the changing regulatory environment associated with closed landfills as it relates to maintenance and infrastructure funding, assessment of the long -term funding required to maintain the landfill infrastructure, and an assessment of the City's possible financial liability associated with a major earthquake or other natural disaster. Funding of $250,000 is provided from the Shoreline Community Fund. Recycled Water System Expansion Feasibility Study, Project 12 -40 ($200,000) —This project will fund a feasibility study of options for the expansion and improvement of the City's existing recycled water system. In 2009, the Cities of Mountain View and Palo Alto completed construction of a system to supply recycled water from the Regional Water Quality Control Plant in Palo Alto to many of Mountain View's largest water consumers and business customers in the North Bayshore Area for irrigation purposes. The existing system will need to be expanded to other areas of the City to significantly increase recycled water consumption in the future. The feasibility study, funded from the Water Fund, will identify large potential recycled water customers south of Highway 101 and Moffett Field, potential pipeline locations (including the development of a looped system to increase reliability) and additional infrastructure needed to support an expansion of the system; investigate the feasibility of interconnections with the City of Sunnyvale's recycled City Council August 29, 2011 Page 11 water system to maximize water reuse while minimizing construction costs; develop preliminary project plans and costs; and address other expansion related issues. Trash Capture Demonstration Project, Project 12--41 ($275,000) —New State regulations require that municipalities install trash capture devices on a portion of storm drain systems by July 2014. On December 7, 2010, the City Council approved an agreement with the Association of Bay Area Governments (ABAG) for the City's participation in the grant - funded Bay Area -Wide Trash Capture Demonstration Project. Grant funds of $70,000 are available for Mountain View. With additional funding of $205,000 from the Storm Drain Construction Fund, the total project budget is $275,000. Shoreline Transportation Study, Project 12 -42 ($500,000) —This project will study possible transportation systems in the Shoreline Community and propose strategies to provide adequate and efficient transportation systems to serve the Community. Possible areas of study include improved mass transit options, additional options for access into and out of the Community, infrastructure and services associated with improved transportation, and funding mechanisms. Funding of $500,000 is provided from the Shoreline Community Fund. City Council August 29, 2011 Page 12 CONCLUSION The Adopted FY 2011 -12 CIP places a priority on funding annual and periodic infrastructure projects that preserve the City's significant investment in infrastructure and facilities, and a number of new projects responding to department and Council priorities. Staff will present a new Five -Year CIP to the City Council in spring 2012 for the FY 2012 -13 through FY 2016 -17 capital improvement planning period. This process will allow for a broader opportunity for the Council to discuss new projects, capital initiatives and funding opportunities. Prepared by: J rry Burgess Senior Administrative Analyst d Linda Forsberg Transportation and Business Manager JB- LF /6 /PSD 791- 07- 22- 11M -E^ Approved by: ;0e,41A Michael A. Fuller Public Works Director �' aniel H, � Rrch � City Manager Attachments: 1. Adopted FY 2011 -12 Capital Improvement Program 2. Projects to Close 3. Active Projects to Remain Open 4. Funding Reductions for Annual and Periodic Maintenance Projects 5. Water and Sewer Master Plans —ICey Findings 6. FY 2011 -12 Information Technology Computer Projects 7. Energy Conservation Measures Attachment 1 Adopted Capital Improvement Projects, FY2011 -12 Brief descriptions and funding sources for the projects below are provided on the following pages. All costs are shown in thousands, Project Project Description Bum Non - Discretionary Projects 12 -01 11 -12 Street Resurfacing Program $812 12 -02 11 -12 Traffic Signal and Street Light Pole Replacements/Modifications $192 12 -03 11 -12 Slurry Seal Program $119 12 -04 11 -12 Water System Improvements $314 12 -05 11 -12 Wastewater System Improvements $141 12 -06 11 -12 Concrete SidewalldCurb Repairs $271 12 -07 11 -12 Parks Pathway Resurfacing $73 12 -08 11 -12 Shoreline Pathway, Roadway, Parking Improvements $173 12 -09 11-12 Forestry Maintenance Program and Street Tree Replanting $281 12 -10 11 -12 Shoreline Landfill Cap Maintenance and Repairs $119 12 -11 11 -12 Developer Reimbursements $108 12-12 11 -12 Street Lane Line and Legend Repainting $50 12 -13 11 -12 Landfill Gas /Leachate System Repairs & Improvements $119 12 -14 11 -12 Facilities Maintenance Plan $487 12 -15 H-12 -12 Annual Traffic Studies /NTMP Improvements $119 12 -16 11 -12 Maintenance Agreement for JPB /VTA Transit Center $ 54 12 -17 Shoreline Infrastructure Maintenance $216 12 -18 Information Technology Computer Projects $485 12 -19 Biennial Median Renovations and Roadway Landscape Renovations $65 12 -20 Biennial Real Estate Technical and Legal Sei vices $65 12 -21 Miscellaneous Water Main/Service Line Replacement $1,415 12 -22 Miscellaneous Storm /Sanitary Sewer Main Replacement $1,405 12 -23 TDA Projects $60 12 -24 Installation of ADA Club Ramps, Phase VII $114 12 -25 Biennial PMP Recertification $64 12 -26 11 -12 Annual New Energy Conservation Measures $81 12 -27 Cape Seal Program $500 Total of Non- Discretionary Projects $7,902 Amendments to Active Projects 09 -26 Permanente Creek Trail Charleston Road Undererossing Feasibility Study $80 09 -28 Rengstorff Avenue Grade Separation/High Speed Rail Coordination $0 09 -46 San Ramon Avenue Reconstruction ($650) 11 -30 San Luis Avenue Reconstruction $500 11 -02 10 -11 Traffic Signal and Street Light Pole Rep lacen-ients/Mo dific ations $0 Page I of 12 _Adopted Capital improvement Proiects, FY2011 -12 Brief descriptions and funding sources for the projects below are provided on the following pages. All costs are shown in thousands. Project Project Description Budget 10 -18 Information Technology Computer Projects ($75) 11 -18 Information Technology Computer Projects $75 09 -40 Burgoyne Street Reconstruction ($35) 11 -26 10 -11 Annual New Energy Conservation Measures $11 Total of Amendments to Active Projects ($94) Discretionary Projects Facilities Prolects 12 -28 Police /Fire Administration Building Refurbishment $450 12 -29 Mechanical System Replacement at Eagle and Rengstorff Pools $780 Streets and Sidewalks 12 -30 Vassar Avenue Reconstruction, Construction $400 12 -31 Induction Lighting Replacements, Phase 1 $700 12 -32 Middlefield Road Median Islands Reconstruction, Easy Street to Shoreline Blvd. $780 Parks and Recreation 12 -33 Critttenden Park (West field) Turf Replacement, Design and Construction $1,485 12 -34 Parks and Trails Maintenance Projects $124 12 -35 Permanente Creels Trail; Old Middlefield Way to Rock Street $330 12 -36 Rock Church Refurbishment and Modification $500 Information Technology 12 -37 Microfiche to Digital Imaging Conversion $460 Studies 12 -38 AlignmentlConstructability Study for Utility Crossing Replacements at Hwy 101 and 85 $134 12 -39 Landfill Infrastructure Master Plan Study $250 1240 Recycled Water System Expansion Feasibility Study $200 Regulatory Requirements 12 -41 Trash Capture Demonstration Project $275 Transportation 12 -42 Shoreline Transportation Study $500 Total of Discretionary Projects $7,368 TOTAL OF PROJECTS $15,176 Page 2 of 12 Adopted Capital Improvement Projects, FY2011 -12 All costs are shown in thousands. Item Project Description_ Funding FY2011 -12 Source Funding Non-Discretionary Projects 12 -01 11 -12 Street Resurfacing Program C/C Tax $81 Install asphalt concrete and fog seal Gas Tax 731 overlays, raise utilities and monuments. 12 -02 11 -12 Traffic Signal and Street Light CIC Tax $192 Pole Replacements /Modifications Replace traffic signal controllers, traffic detector loops, back -up batteries and LED traffic signal lights. Includes minor modifications to existing traffic signals to improve traffic safety. Replace 8 to 12 damaged and/or end -of -life street light poles. 12 -03 11 -12 Slurry Seal Program CIC Tax $12 Apply slurry seal to selected street surfaces Gas Tax 107 and City facility parking lots as required. 12-04 11 -12 Water System Improvements Water $314 Scheduled replacement of water system components and minor unscheduled improvements to the City's water system. 12 -05 11 -12 Wastewater System Improvements Wastewater $141 Unscheduled improvements /repairs to the City's wastewater collection and pumping system. 12 -06 I1 -12 Concrete Sidewalk/Curb Repairs CIC Tax $271 Replace deteriorated sidewalks and repair concrete curbs, gutters, and sidewalks displaced by street tree growth, and /or failure of City -owned utilities. 12 -07 11 -12 Parks Pathway Resurfacing C/C Tax $73 Renovate various park pathways within City parks. Page 3 of 12 Item Protect Description Funding Source 12 -08 11 -12 Shoreline Pathway, Roadway, Shoreline Parking Improvements Community Correct drainage problems and damage due to differential settlement; provide pathway, roadway and parking- related improvements. 12 -09 11 -12 Forestry Maintenance Program C/C Tax and Street Tree Replanting Contract to prune, remove, stump, purchase and plant approximately 800 to 1,000 medium to large trees within the City. Maintain trees damaged by freezing, disease, drought and other natural causes. 12 -10 11 -12 Shoreline Landfill Cap Solid Waste Maintenance and Repairs Regulatory mandates of the Bay Area Air Quality Management District and the Regional Water Quality Control Board require the City to protect the integrity of the landfill cap and prevent surface emissions by regrading, filling, recompacting, and making other improvements. 12 -11 11 -12 Developer Reimbursements C/C Tax Construction of street and utility Water improvements concurrent with private development. Adjacent properties Wastewater benefiting from street and utility Storm Drain improvements will be required to reimburse the City for the improvements. 12 -12 11-12 Street Lane Line and Legend C/C Tax Repainting Annual repainting City street lane lines and legends, as needed. 12 -13 11 -12 Landfill Gas /Leachate System Solid Waste Repairs and Improvements Annual repairs and improvements to large components of the landfill gas and leachate system. Page 4 of 12 FY2011 -12 Fundin $173 $281 $119 $27 27 27 27 $50 $119 Item Project Description Funding FY2011 -12 47 Source Fundin 12 -14 11 -12 Facilities Maintenance Plan CIC Tax $379 Repair, replace, or maintain City facilities Shoreline 108 (HVAC, roofs, carpets, plumbing, etc.). Community Community 12 -15 11 -12 Annual Traffic StudiesJNTMP CIC Tax $119 Improvements Funding for traffic calming devices on neighborhood, local, and residential streets in conformance with the Neighborhood Traffic Management Program, and annual contracts with traffic consultants to assist the Traffic Section with neighborhood traffic issues. 12 -16 11 -12 Maintenance Agreement for Other $54 JPBIVTA Transit Center (Reimbursement) Reimbursement of City expenses by JPB /VTA. 12 -17 Shoreline Infrastructure Maintenance Shoreline $216 Maintenance of water lines, sewer lines, Community storm drainage system, water system supplying the sailing lake. 12 -18 Information Technology Computer CIC Tax $288 Projects Water 47 Future information services projects. Wastewater 41 Solid Waste 8 Gas Tax 2 Shoreline 69 Community Downtown 8 Revitalization Authority Building 22 Services Page 5 of 12 Item Proiect Description Fundin Source 12.19 Biennial Median Renovations and CIC Tax Roadway Landscape Renovations Biennial repairs and improvements to City landscaped medians and roadway landscaping, 12 -20 Biennial Real Estate Technical and Legal CIC Tax Services Shoreline Funding for appraisals, environmental Community reports, surveys, lease preparation/review services for City Real Estate activity. Park Land Fund 12 -21 Miscellaneous Water Main /Service Line Water Replacement Replace corroded and/or undersized cast iron pipe water mains on various streets. The replacements include water services, fire hydrants and saddle replacements. 12 -22 Miscellaneous Storm/Sanitary Sewer Wastewater Main Replacement Repair and replace storm and sanitary sewer pipes, manholes and systems identified by the City's amival line televising program. 12 -23 TDA Projects CIC Tax Various bike and pedestrian related Other (State proj ects. grant) 12 -24 Installation of ADA Curb Ramps, CIC Tax Phase VII Install approximately 20 ADA- compliant curb ramps throughout the City. 12 -25 Biennial PMP Recertification CIC Tax Field inspection of all arterial and collector streets as required by the Metropolitan Transportation Commission (MTC). Page 6 of 12 FY2011 -12 Funding $65 $16 8 41 $1,415 $1,405 $10 50 $114 $64 Item Project Description Fundin Source 12 -26 11 -12 Annual New Energy Conservation C/C Tax Measures Fund energy conservation efforts in City facilities. 12 -27 Cape Seal Program Periodic application of liquid asphalt emulsion to 19 streets and 3 alleyways that were partially improved when they were annexed from the County to the City. Treatment maintains durability and functional travelways. Amendments to Active Protects 09 -26 Permanente Creek Trail Charleston Road Undercrossing Feasibility Study Additional funding to study extension of trail from Rock Street to Middlefield Road and evaluate existing undercrossing at Amphitheatre Parkway. 09 -28 Rengstorff Avenue Grade Separation /High Speed Rail Coordination Replace Gas Tax funding with C/C Tax funding. Project is now funding the City's highspeed rail coordination efforts and is not eligible for Gas Tax funding. C/C Tax Gas Tax Other (State Grant) C/C Tax Shoreline Community Gas Tax C/C Tax 09 -46 San Ramon Avenue Reconstruction Other (State Transfer funding and combine project with Funding) San Luis Avenue Reconstruction project to achieve economy of scale and possibly lower construction costs. 11 -30 San Luis Avenue Reconstruction Accept Funding from San Rai-non Avenue Reconstruction project and combine the two projects to achieve economy of scale and possibly lower construction costs. Reduce Gas Tax funding as project is well within budget. Page 7 of 12 Other (State Funding) Gas Tax FY2011 -12 Funding $81 $50 376 74 $60 20 ($250) 250 ($650) $650 (150) Item Project Description Fundin Source 11 -02 10 -11 Traffic Signal and Street Light C/C Tax Pole Replacements /Modifications Shoreline Replace C/C Tax funding with Shoreline Community Community funding for recent work performed in North Bay Shore area. 10 -18 Information Technology Computer CIC Tax Projects Funding for the Permit Tracking System project exists in Projects 10 -18 and 11 -18. Combine the funding and simplify project administration by transferring Permit Tracking System funding to Project 11 -18. 11 -18 Information Technology Computer C/C Tax Projects Funding for the Permit Tracking System project exists in Projects 1018 and I1 -18. Combine the funding and simplify project administration by accepting Pennit Tracking System funding from Project 10- 18. 09 -40 Burgoyne Street Reconstruction CIP Reserve Transfer unused funds to proposed new project, Middlefield Road Median Islands Reconstruction, Easy Street to Shoreline Boulevard. 11 -26 10 -11 Annual New Energy Conservation Other (PG &E Measures Incentive Additional funding to incorporate rebates Payment) and implement new energy conservation measures. Facilities Projects 12 -28 Police /Fire Administration Building Refurbishment Repair and refurbishment of Police/Fire Building to improve space efficiency and building safety, replace outmoded features, and improve the Emergency Operations Center (EOC). Page 8 of 12 C/C Tax FY2011 -12 Fun ding ($25) 25 ($75) $75 ($35) $11 $450 Item Project Descri tion 12 -29 Mechanical System Replacement at Eagle and Rengstorff Pools Replacement of mechanical systems to address health and safety issues associated with the operation of public swimming Pools. Streets and Sidewalks 12 -30 Vassar Avenue Reconstruction, Construction Construction of curbs, gutters and driveway approaches and pavement on Vassar Avenue. 12 -31 Induction Lighting Replacements, Phase 1 Install approximately 1,600 new, energy efficient lights along high - traffic roadways and in the City's North Bayshore .Area. 12 -32 Middlefield Road Median Islands Reconstruction, Easy Street to Shoreline Boulevard Reconstruction of median island curbs, installation of striping and pavement markings, installation of median pavers and mowing strip, and associated miscellaneous improvements. Parks and Recreation Fundin Source C/C Tax C/C Tax Gas Tax C/C Tax Shoreline Community CIP Reserve C/C Tax Gas Tax Other (Federal Grant) 12-33 Crittenden Park (West Field) Turf Park Land Replacement, Design and Construction Fund Convert the Crittenden Field to synthetic turf to increase the field's playing capacity. Page 9 of 12 FY2011 -12 Fundinjj $780 $35 365 $630 70 $35 43 50 652 $1,485 Item Proiect Description Funding Middlefield Way to Rock Street Source 12 -34 Parks and Trails Maintenance Projects C/C Tax Replacement of wooden planks on each Shoreline side of the Stevens Creek Trail (SCT) Community Bridge over Central Expressway, Fund construction of a curb cut at SCT and Park Land Evelyn Avenue, replacement of six sailing Fund lake docks, and improvements to the Skate Park facility in Rengstorff Park. 12 -35 Permanente Creels Trail: Old Parks Land Middlefield Way to Rock Street Other (Grant Extension of the Permanente Creek Trail Funding) from Old Middlefield Way to Rock Street. 12 -36 Rock Church Refurbishment and Park Land Modification Fund Placeholder funding for the refurbishment and modification of the Rock Church building to support interim City uses. Information Technology 12 -37 Microfiche to Digital Imaging Building Conversion Services Conversion of existing Building Division records on microfiche to a digital imaging system. Studies 12 -38 Alignment /Constructability Study for Utility Crossing Replacements at Hwy 101 and 85 Preliminary engineering services to study the realignment of water and sewer mains under Highways 101 and 85. Page 10 of 12 Water Wastewater FY2011 -12 Funding $55 Ki 24 $187 143 $500 $460 $67 67 Item Project Description Funding FY2011 -12 Source Funding 12 -39 Landfill Infrastructure Master Plan Shoreline $250 Study Community Evaluation of City's closed landfill to assess infrastructure condition, the changing regulatory environment, long -term funding requirements for maintenance, and the City's possible financial liability associated with natural disasters. 12 -40 Recycled Water System Expansion Water $200 Feasibility Study Feasibility study of options for the expansion and improvement of the City's existing recycled water system. Regulatory Requirements 12 -41 Trash Capture Demonstration Project Storm Drain $205 Install trash capture devices on a portion of Other (ABAG 70 the City's storm drain system to comply Grant) with new State regulations. Transportation 12 -42 Shoreline Transportation Study Shoreline $500 Study possible transportation systems in the Community Shoreline Community and propose strategies to provide adequate and efficient transportation systems to serve the Community. Total 15 176 Page 11 of 12 FY2011 -12 PROJECTS FUNDING SUMMARY CEP Reserve 0 C/C Tax 4,451 Water Fund 2,070 Wastewater Fund 1,681 Storm Drain Fund 232 Solid Waste Management Fund 246 Gas Tax Fund 1,231 Shoreline Community Fund 1,484 Downtown Revitalization Authority 8 Park Land Fund 2,237 Building Services Fund 482 Other 1,054 Total 15 176 Primary Funding Sources CIP ReserveCIP Reserve fiords in excess of the reserve policy goal of $5.0 million may be used for the funding of any type of capital improvement project. Construction /Conveyance Tax C/C Tax revenues may be used for the funding of any type of capital improvement project, including servicing bonds issued in connection with those improvements. Water Fund Water Fund revenues intended for capital improvement projects may only he used on projects that relate to the supply, distribution and metering of water used by consumers in the City's service area. Wastewater Fund—Wastewater revenues intended for capital improvement projects may only be used on projects that relate to the transportation and processing of wastewater. Gas Tax Fund —Gas Tax revenues intended for capital improvement projects may only be used for the design and construction of roadway improvements. Shoreline Community Fund — Shoreline Community Fluid revenues may be used for capital improvement projects that facilitate the development and support of the Shoreline Regional Park and the surrounding North Bayshore Area. Park Land Dedication Fund Park Land Dedication Fund revenues are to be used for Parks and Recreation projects related to the purchase of park land or recreation equipment, the development of recreation sites, parks and open spaces, and the rehabilitation of existing park and recreation facilities. They are not intended for ongoing maintenance or operating expenses. Page 12 of 12 Project No. Project Till, ADOPTED FY 2011 -12 PROJECTS ESTIMATED AVAILABLE BALANCE AT JULY 1, 2011 Aruomt from Bdmrce Avaioblc far Capital ttaa amentPtga- Additional Moneys Designmed for Capital Improvement Projects Bdance Gom Pt jects to be Closed on Jane 30, 2011 Told Amount Available to, Capkal Projecd e J3 1,484 2,407 8,462 877 1,171 2,778 20,695 1,223 5,500 1,102 5,162 D 56,851 -33 7,484 1,234 0 877 169 2,778 1,158 88 B 84 482 0 14,329 0 0 1,528 1,585 0 230 0 0 0 4,311 0 1,054 8,708 17 340 1,M4 898 0 0 0 326 0 0 398 0 0 3,563 -16 7,824 4,346 2,483 871 3W 2,778 1,484 88 8 4,395 482 1.54 26,202 Comments et R_es - PWD ADOPTED FY 2011 -12 CAPITAL IMPROVEMENT PROGRAM 81 PRGIECF FUNDING SGUKCJ 731 Capital Constt -v Strom solid shoreline Downtown Olherl'wding Prevailing Improvement Conve- Waste 33raio Waste G. ,-alp" parking RevimBe.- Park Land Building So- Sponsor Wage Reserve Tax Water Water Canstructlm Mmagement Tax Commmity District Authority Dedication Services (See Dept Pr ject7 Fmd Fwd Fwd Food Fund Food Food Fwd Food Fmdivg Food Food Cammerds) Totals J3 1,484 2,407 8,462 877 1,171 2,778 20,695 1,223 5,500 1,102 5,162 D 56,851 -33 7,484 1,234 0 877 169 2,778 1,158 88 B 84 482 0 14,329 0 0 1,528 1,585 0 230 0 0 0 4,311 0 1,054 8,708 17 340 1,M4 898 0 0 0 326 0 0 398 0 0 3,563 -16 7,824 4,346 2,483 871 3W 2,778 1,484 88 8 4,395 482 1.54 26,202 Comments et R_es - PWD Yes 81 731 912 Si Pole 12A3 II -12 Slurry Seal Progrmn 12 -04 11 -12 Water System Improvements - - PWD PWD PSD No Yes No 192 12 314 107 _._ 192 119 S30K is fr fe hmnment of 8.12 weetliglrn 314 - 12 -05 11- 12Wasrewater Synem lm ova PSD No 141 141 271 73 173 281 12 -06 1142 Concrete Sidewalk/Cufi Repwata - PWD Yea 12 -07 I1 -12 Parks Pathway Resurfacing 12 -08 11 -12 Shoreline Pathway, Roadway, Parking Improvements 12 -09 I 1 -12 Forestry Maintenance Program and Street Tree Replan " 12 -10 11 -12 Shoreline Landfil] Cap Maintenance and airs - ` CSD CSD CSD PSD No No No No 281 119 173 _ 119 l2 -Il 11 -12 DCVCloper Rcinmb -a- 12 -12 11 -12 Skeet Lane Line and Legend Repainting 12 -13 11- 12Lmdfll CmdLeacha[e System Repairs &lmprovenxots 12 -14 11- 12F -h1ies Mains once Plan 1215 1112 Annual TraRc Studies/IJTMP -- - 12 -16 ll- 12Maimenance Agt --1for JPBMATreamir Cenrer PWD PW o PSD PSD PWD PWD No Yes No TBD No No 27 379 119 27 27 27 119 108 _ 54 108 50 119 487 119 54 $54KRombvsamevtofCi pgmnsesby JPBNTA 12 -17 Shoreline hSrastmctme Mvntnunce 12-18 hdbrmation Tectmolo Com umr Pro acts PSD FASD No No 288 41 41 8 2 216 69 8 m 216 485 -]2 -19 Bieanial Median Reno -t- and Roadway Landscape _ -20 Bieooial Real Estate Technical ard Le Services '21 Miscellaneous Water Main /$ervice Line Replacem _ 22 Miscellaneous Stotoods -my Sewer Main Repl ant ...- CSD PWD PWD 'PWD No No Yea Yea 16 1,415 1,405 8 41 65 65 1,415 _ 1,405 23_., TDA Projects _ _ PWD TBD 10 50 w $50K State&aot 24 lnsldlation of ADA CLrb Ramps, Phase Vll. -.. " -25 Biermiol PMP Recer[ificmim - PWD PWD Yes N0 64 - 114 64 ld- -. PSD PWp No Yas 50 .376 74 81 500 RAC Sall Groot Gom the of RC Re and Recovm Totdof -- Di- diooary Prajedr 0 2,173 1,803 1,614 21 246 1,216 574 0 8 41 22 178 7,902 Amendments to Active Projects 09-26 Permmlente Creek Treil Charleston Road Ural ..s," F- ibdity Study C- .Fund" PWD No 0 0 60 0 0 0 - 0 0 0 0 0 0 0 0 20 200 0 0, 0 0 0 - 0 0 0 0 0 80 200 Total Fmd" 0 60 0 0 0 0 0 220 0 0 0 0 0 280 09-28 Itengsto Aveme(nade Sepmatica/High Speed Rail Coordination PWD No 0 250 0 0 0 0 -250 0 0 -0 0 0 0 0 C=tFmdivg - 0 50 0 0 0 0 250 0 0 50 0 0 0 350 _ Total Fending 0 300 - 0 0 0 0 0 0 0 50 0 0 0 350 09 46 Sao Remora Avenue Rewnatructim PWD Yea 0 0 0 0 0 0 0 0 0 0 0 0 450 650 San Ramon Avenue Reconstruction ( Project 09 -06Nork will be folded iOto Pm' I1-30 L\nrent Fending 0 0 0 0 0 0 0 0 0 0 0 D 650 650 S639Kd0roplB Stau Bond Fund" ;$llKofSuta G-t Ftm' Trod I iI 0 . 0 0 0 0 0 O 0 0 0 D 0 0 11-30 San Lois AvenmR tattootion PWD Yea 0 0 0 0 0 0 -150 0 0 0 0 0 650 500 S639K ofPWlB Stale Bond Fm' ;$IIKofStaw GmntFm" Clnrenl Pm dlag 0 50 0 0 0 0 520 0 0 0 0 0 0 570 TO Fm" 0- 50 D 0 0 0 37D 0 0 0 0 0 650 1.70 9m Ramon Avenue Recormwctim(Pr jotK 0946}.vork wBl bra folded into PrjeR 11 -30 11 -02 I0-11 Trailb Signal and Street LiglRPOh: Replecemenb/Modifi-tats PWD No 0 -25 0 0 0 0 0 25 0 0 0 0 0 0 C- Fording O 210 0 0 0 0 0 0 0 0 D D -0 210 T.al Funding O 185 0 0 0 0 0 25 0 0 0 0 0 IN Adopted PY 2011-12 Capital wprovemeat Program Page 1, 9/9/2011, 3:41 PM ADOPTED Fi( 2011 -12 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING 5DURCES Wpiw ConstrucfioN Storm Solid Shoreline Downtown General Fund: Other Funding Prewiling Impmvmamt Conveyance Waste chain Waste Can Regiowl Pork Parking Reviml.z. Parkland Building Sowcea Sponsor Wage Reserve Tax Water Water Cotutru — Management Tex Community District Authority Dedication Semces (See PmjeRN.. Pmjeet Tide Dept Prject7 Fwd Fund Fund Fwd Fund Fund Fund Fund Fund Fmding Fund Fond Comwmu) Totals Comments 10 -18 Amendments to Active Project3 (cautinued) 7efatmadon Technobgy ComputerPrjects FASD No 0 -75 0 0 D 0 0 0 0 0 0 0 0 -75 Cmmmt Fording 0 190 125 125 33 33 0 0 0 0 0 506 Total Fording 0 115 _ 125 125 0 D 0 33 0 0 0 0 0 431 11 -18 hd a[iw Technology CompuWP,,jects FASD No 0 75 0 0 0 0 0 0 0 0 0 0 0 75 UnrwtFwding 0 150 15 IS 0 0 0 120 0 0 O 200 0 500 Total Fording 0 -225 15 15 0 0 0 120 0 0 O 200 0 575 0930 Burgoyne Street Recwstroction PWD Yes .35 0 0 0 0 0 0 0 0 0 0 0 0 -35 Current Fmding 800 0 0 0 0 O 0 0 0 0 0 0 427 1,227 83g alO WIB St Bmd Fwdin %IKUf3t-Or K.Jiog Total Fording 765 0 0 0 0 O 0 0 O 0 0 0 427 1,192 11 -M 10-11 Awusl New Energy Cwsei .M..— PWD No 0 0 0 O 0 0 0 0 O U U U 11 Il P ElrmmBva Payment Cwrn[Fw.Iing 0 160 0 0 0 0 Il O 0 0 0 0 0 160 T-1 Fording 0 160 0 0 0 0 0 0 0 0 0 Q 11 171 Total OfAmendments t0 Aftme Projects -35 - 285 0 0 0 0 -0W 45 0 0 0 0 11 -94 Total of Non - Discretionary Projects and Amended Funding Requests -35 2,458 1,803 1,614 27 246 816 619 0 8 41 22 189 7,808 Amount Available for Capital Projects Less Total of Nom- diecreti...0 and Amended Funding Requests Equals Ammount Availabl a for Discrelionary Projects 19 5,366 2,543 869 950 153 1,962 865 88 0 4,354 460 865 18.394 Discretionary I'miecfs Facilities Proi- 1b28 _ PoacuFhe Admintshation Building Refurbishment PWD TBD 450 450 12 -29 Meehmical System Replacement at Eagle and Rengstorff Pools CSD No 780 _ _ 780 streets and Sidewalks _ 12 -30 Vassar A R constructl C trw[ion .PWD 35 _ 365 _ 400 12 -31 12 -32 12 -33 _ lnduct,m Lighting Replacements, Phase l Middlefidd ROd Medsan Islands Re..n, coon, L., Street to Shoreline Blyd. Parts and Recreation Critttmden Park(WestField)T,,dReplacemwt, Designmd Construction PWD C5D No Yea Y. 35 630 43 So 70 1485 652 700 780 Federal tlSlP (Ni way Sekry lm men[PrOgmm)Grmt 1,485 Perk Land fordiq has been 'o dei tad by Cowell I—t Pinks end Tmih Maintenance Projects —/CSI) No 55 45 24 - IV •• SeecommeMbelowfurbreakdown ofprojectsmdfw" 12 -35 Permm,mde Creek' Dail: Old Middlefield Weyto Rock Street PWD Yen 187 _ 143 330 Full Grant Fuding Pending PRCappmvd Sl87Kof Park LmdFw' ono -l3 -lI 12 -36 Rock Chwch Refurbishment and Modification PWD TBD _ 500 __. 500 PRC AppmW Pack Lwdf odimgw4 -13 -11 12-37 I2-38 12 -39 1230 Imfnrmation Terhnolmev Microfiche to D g W imag g C StuJ "c, A`ignmenVConmucabiiiry Study for Utility_Cm_s_,ing Replacements a[Hwy 101 ed85 LaWftl lnfrastrucnue Master Plan Study Recycled Water System Erparniw Feasibility Study Re..la_tory Reauiremenu FASD PWD PWD PWD No No No No 67 200 67 250 460 460 134 250 NO 1231 _ Trash Captive Demortstratiw Project PWD Yu 205 -__ _ 70 275 $70KABAGGreta _ _. 1232 Shorehm Trmsporta[iov Study CDD No 500 - 500 _ Totalof Dtacreti..." Pro— 35 1993 267 67 205 0 415 865 0 0 2,1% 460 865 7,368 TOTAL OF PROJECTS 0 4,451 2,070 1,681 232 246 1,231 1,484 n 9 2,737 1.2 I,IL54 15,176 ESTIMATED AVAILABLE BALANCES dune 30, 2012 46 3,373 2,276 802 645 153 1,547 0 88 0 2,158 0 0 11,026 Key to Color Codine ®New Projects Projeas with budgetreduced by 50"/ or mwre in F'Y2010.Il Adopid CI? "Roll Fmwmd "Projects Prplecfswithbudgetredwdby 25%i FY20MI1Adopted CIP • Fwda mtumcdto the ClP Reserve from closed projects were lessthm wticipeted in Fiscal Yem 2009 -10 resulting in anegative bolmce ofapprozimatuly 8d3, 000( reduced to $33,000 dw:ng FY2010 -11). FY 2010 -IICIP Reserve refwds from closed projects of approvmately 517,000 were notsu %cientto corryrletely oRsettlus asagazive bilmce. •" Project l2 -34. TheSMreline Sailing Lake DOCk Repiecemw[ project isfwdeJ wiJ, SRPC fwJing of g27, 000; the Smvrsm Creek TmiVEvclyn Avenue /Curvnl Expreeaway Landing Mea project isfwdd with 3RPC fording of $18,000 and C/C TaxfwJing of $53, 000, We skate PVk Modifications p,oject is fm,deJ wtOt 823,500 of Perk Landfwding and b2,WDOfC /C Ten Landing. Adapt dFY 2011 -12 Capital Improvement Program Page 2, 9/8/2011, 3:41 PM P opd No Pmject Title PLANNED FY 2012 -13 PROJECTS ESTIMATED FUNDING AVAILABLE AT JULY 1, W12 Net Revenue Availablefa Fiscal Yem •o• Total Amoonl Available for Capital Projects Comments 13 -D1 121351r@et Rasmf mg Ptogmm PWD Yes ADOPTED FY 2011 -12 CAPTTAL IMPROVEMENT PROGRAM 77 696 55 PROJECT FUNDING SOURCES -828 13 -D2 12- 13Trat&c Signd wd Street Light Pole Replacements /Madifiwtiom`= PWD No 197 Capiw CorutmceoN Stow Solid Shoelwn Downmwn Gcnctal Fwd: Od. Fording 131 K is for the re placement of 8 12sewdights F -iling Improvement Conveyance - Waste Drain W.. Gas Regional Pa,k Pahing Revitsfvation P.kl -I Bolding Sows Sponsor Wage Reserve T. Water Wamr C ... ooch" Msnegwoeat I. Commwity District Authority Dedication Services (See Dept Project? Fwd Fwd Fund Fund Flmd Fwd Food Fund Fwd Fording Fwd Fwd C.--) Totals -16 3,373 2,276 802 645 153 1,547 0 88 0 2.158 0 0 1107 0 1,453 1,598 1,639 33 230 850 3,621 75 1307 12- 13Perk Pathway ResmfwL_- CSD No 0 0 -105 9,528 -16 4,826 3,874 2,440 678 383 2,397 3,621 88 0 2,158 0 105 20,554 Comments 13 -D1 121351r@et Rasmf mg Ptogmm PWD Yes 77 696 55 -828 13 -D2 12- 13Trat&c Signd wd Street Light Pole Replacements /Madifiwtiom`= PWD No 197 197 131 K is for the re placement of 8 12sewdights 121 13 -D3 1213 Slang Seal Program Y1YD Yes 12 109 13 -M 12- 13 -Sysmn hnprav PSD No 320 320 13 -05 12 -13 Wastewater S em fmpmvements RED No 144 144 13 -M 12 -13 Cmcmte Sidmlk/Club Repays _ PWD - Yes 276 75 1307 12- 13Perk Pathway ResmfwL_- CSD No 1-8 12 -13 Shoreline Pathway, Roadway, Parking W,pro CSD No 177 177 287 13 -09 12 -13 Forestry Mainrmmce Program and S- T. Rcplwting CSD No 287 13 -10 12 -13 Shoreline Landfill Cw Maintenance and A s PSD No 121 121 13_11 12 -13 Developer Reimbursements FWD No 28 28 25 28 112 13 -12 12 -13 Sbeet Lane Li and Legend Repainting PWD Yes 276 276 13 -13 12 -13 lwdfll Gas/Leachate System Repays & Inprovemmts - PSD No 121 121 496 13 -14 12 -13 Facilitiex Maintenw.e Plan PSD TED 386 110 13 -15 1213 Awuil Traffic Studies/N[MP Im rev ®mn 1)WD No 121 121 13 -16 12- I3Main o-c ASree -for JPBMATrwsit Ceohr PWD No 55 55 S55KReimbmaemeotofC' JPB/VTA 13 -17 Shoreline lofmstraotme Maintenance PSD No 221 221 13 -18 Information Tecfnology Computer Projects FASD No 188 121 121 33 33 4% 13 -19 Biem,isl Padr Renovazions/rmprovemen¢ CSD No 99 I3 -20 Biwmid Good Neighbor Fence R.,,1- CSD No 33 13-21 Mscellweous Water Maio/S -. Line Replacement PWD Yes 1,665 1.665 1,435 13 -22 M ... Itweous Stonn/Ssoam Sewer Main Replacement PWD Yea 1,435 13 -23 TDA Proj- PWD TED 10 50 60 S50K State Gmot 13 -24 Bicwisl ADA Impipvements to t;ity Pa u. CM TBD 83 83 13 -25 hutaDation ofADA Curb Ram a, Pbave VDI PWD Yea 116 13 -26 1213A .l New Ene0 Conservation M-occs F. PSD No 166 166 13 -27 ll-,mg Downtosvn. Parking Stnu - - "'' -' PWD - No 88 88 Total of NOV- Discretionary Projerk 0 2,43D 2,134 1.728 28 275 805 596 88 0 0 0 105 8,189 Amuunt Available fur Capital Projects Leas Total of Naa- diaeretionary F, ualaA -- Available for Discretionary Pnij c -16 2j96 1,740 712 650 108 1,592 3,025 0 0 2,158 0 0 12,365 Discretionary Projects Streets and Sidewalks PWD Yes 54 541 595 PerW and Recreation CSD No 835 835 Perk Lmd funding has been previously desig„awd by Cawed T- WDis ... lioea Projects 0 54 0 0 0 0 541 0 0 0 835 0 0 1 1,430 TOTAL OF PROJECTS 0 2,484 2,134 1,728 28 275 1,346 596 88 0 935 0 105 9,619 ESTIMATED AVAILABLE BALANCES June 30 2013 -16 2,342 1,740 712 650 108 1,051 3,025 0 0 1,323 0 0 .1935 Key to Color Cod'ne ®New Pr jecta ® Projectswithbudeet reducedby50%ormare in-ilA10 -Il Adopted ClP "ROE Forwazd" Prjecb Projects with budget rdOCedby 25% N FY2010 -11 Adoptd CIP "Roll Forwwd" Projects hst have been dd .. d 1 yam ••• Oa[eryemrcvmues oES800,000 per year krthe CesTu Fwd assume d,c receipt of Highway Users Tex Accowt(HUTA) fords dvoughout the nest tow fiscal years. Som.o,all Of We Gas Teefuruledp, j.csinds.w yamswllnotgoforwmd SUOd fm,dugisaoteecewv , Adopted FY 2011.12 Capital hoprovemmt Rog,am Page 3,9/8/201 1, 3:41 PM Project NO. P jeer Title PLANNED FY 2013 -14 PROJECTS ESTIMATED FUNDING AVAMABLEAT JULY 1, W13 Net Revenue Available for Fiscal Year ' "" Total Amoant Available for Capital Plljoe Comments 14-01 - 13-1413tte ft-fi cc'oig AO@am 14 -02 _13 -14 Traffic Signal and Street Light Pole 14 -03 13 -14 Slurry SW Program 14 -W 13 -14 Water Sl o-Tmprovanents 14 -05 13 -14 WasmwmerSstem PWD FWD PWD PSD PSD Yes No Yu No _ No ADOPTED FY 2011 -12 CAPITAL IMPROVEMENT PROGRAM 327 _�-- - - -__ -_ -146 709 111 - 56 844 PROJECT FUNDING SOURCES $31KUfin Ne lecemrn[ofg -12 s[reetl 123 327 146 _ 14 -06 13 -14 Concrete Si&.dVCmb Repaos 14 -07 13 -14 Parks Palhwdy Rewrfwi g PWD CSD Capital Camnactioa/ _ 9W,m 9 h - shoreline Dewntwvn Go.e P-d: Other Fending Prevailing Improvement Cmveyavee 14 -08 - 13 -14 Shoreline Pathwa , R Parkin ems y OadsvaY. 14 -09 13 -14 Forestry Maintermnce Pro®am and Sepl " 14 -10 13 -14 Shoreline Landfill Ca Mamteoance 14 -11 13 -14 Developer Reimborsemenm 14 -12 13 -14 Svmt Lane Line and Urod Repain 14 -13 13- 141sndfi1l Gax /Leachate system Repair 1414 13- 14 Facilities MUntrnance Plan 19-15 13 -14 Annual Trafic S.,h -NTMP 19-16 13- 14Mammnance Agreement for JPBNTnter. 14-17 Shoreline loft. uclme Maimeimnce ii 14 -I8 Wormmien TecMology l:o mputer Projects 14 -19 Birnnial Median Rrnovan io and Roadway Landscape ftcnov io ns 14 -20 Biennial lb,a1 Estate Technical and lR d Services Waste Drain Waste Gas lb,. -dPark Pmkmg Revitelimtion Pmk Land Building Sowces - 180 Ili 225 34 8 Sponsor Wsge Reserve Tax Water Winer Con fi.. Management Tax Cammmdty 'District Authority Dedication Services (See Dept. Pr jM7 Food Food Food Food Fund Fimd Fond Fond Fwd Fooding Fwd Fond C.-t,) Totals -16 2,342 1.740 712 650 log 1,051 3,025 0 0 1,323 0 0 10.935 0 1,406 1,620 1,658 30 230 872 3,659 1465 0 0 3,496 12,971 46 3,748 3,360 2,370 680 338 1,923 6,684 0 0 1,323 0 3,4% 23,906 Comments 14-01 - 13-1413tte ft-fi cc'oig AO@am 14 -02 _13 -14 Traffic Signal and Street Light Pole 14 -03 13 -14 Slurry SW Program 14 -W 13 -14 Water Sl o-Tmprovanents 14 -05 13 -14 WasmwmerSstem PWD FWD PWD PSD PSD Yes No Yu No _ No 79 200 12 327 _�-- - - -__ -_ -146 709 111 - 56 844 200 $31KUfin Ne lecemrn[ofg -12 s[reetl 123 327 146 _ 14 -06 13 -14 Concrete Si&.dVCmb Repaos 14 -07 13 -14 Parks Palhwdy Rewrfwi g PWD CSD Yee No _ 292 76 14 -08 - 13 -14 Shoreline Pathwa , R Parkin ems y OadsvaY. 14 -09 13 -14 Forestry Maintermnce Pro®am and Sepl " 14 -10 13 -14 Shoreline Landfill Ca Mamteoance 14 -11 13 -14 Developer Reimborsemenm 14 -12 13 -14 Svmt Lane Line and Urod Repain 14 -13 13- 141sndfi1l Gax /Leachate system Repair 1414 13- 14 Facilities MUntrnance Plan 19-15 13 -14 Annual Trafic S.,h -NTMP 19-16 13- 14Mammnance Agreement for JPBNTnter. 14-17 Shoreline loft. uclme Maimeimnce ii 14 -I8 Wormmien TecMology l:o mputer Projects 14 -19 Birnnial Median Rrnovan io and Roadway Landscape ftcnov io ns 14 -20 Biennial lb,a1 Estate Technical and lR d Services CSD CSD PSD PWD PWD PSD PSD PWD PWD PSD FASO CSD PWD No No No No Yes Na TBD No No No _ No _ No No 293 28 394 124 191 17 28 12A _ _ _ 28 _ _ _ _ _ 124 28 _ _ _ 124 124 _ 14 - 180 Ili 225 34 8 - . - - -- _ - _ _ 43 56 180 293 124 112 50 124 50] $55K Reimbursement of City Expemes by JPB/VTA 124 56. 225 SW 68 66 14-21 Tennis Coort Resurfacing m Cooper, Stevenson Sylvan, and Whismxn 1422 Miscall Water MxWService Line Replacement -.; CSU PWD No Yes 79 1,915 79 1,915 14 -23 Miscellaneous Stlm Sanita Sewer Mm Replacement FWD Yu 1465 1,465 14-24 TDA Proj- 14-25 Instol4o.o of ADA Curb Rams Ph-IX PWD PWD TBD Yes 10 50 60 118 S.50K State Gant 14 -26 _ Biennial PMP Recefication 1427 13- 14Armual New En MD PSD No No 66 _ 66 84 TotalafN9n- Dircrdionery Project, 0 2,171 2,394 1,763 28 282 820 616 0 0 43 0 106 83223 Amaant Available far Capital Projects Lees Total oM - discretionary EqualsAm- Available for Di, ereti.nary ProjM, -16 1,577 966 667 652 56 1,103 6,068 0 0 1,280 0 3,390 15,693 Discretionary Proiects Streer, end Sitlew - DrewAvenue Reconsiru Perks and - Sotrlh Nh�ama Ar ,PatK - PWD CSD Yes Yes SY 552 1 ?80 3, 390 607 4,670 53.39M Otberfimd' uoidarofied'Pnrk Landfmd' oast den red Total of Din -ione Pro'eek, 0 55 0 0 0 0 552 0 0 0 1,280 o 3,390 5,277 TOTAL OE PROJECTS 0 2,226 2,294 1,763 28 282 M72 616 0 0 1,313 0 3,496 13,500 ESTIMATED AVAILABLE BALANCES June 30,2014 -16 1,522 966 6. 652 56 551 6,069 o 0 u u B 1g4W Key to Color Coding New Projecm P- P-with Mdgetred -d by 50° /. mmare in P -10-11 Adopted CIP "ROB Forward "Prjects Rjecis thWdgdmducedby Z%,FY2010-31Adopted CW "Roll Forward" ProjmU Nat have been deferred 1 year " "" Dumr year revenues of S 800, 000 +peryemin the Gas Tex Fund assume Ne receipt ofHighway Users Taz ACCOUN(IfUTA)f dsd,,.gh,.tthe - fo,fscelyeers Some or all of the Gas Taxfimded projects in the cuter years willno[go forward ifthisfwding is not received. Adopted FY 2011 -12 Capital hnprovemrnt Program Pagc 4,918/2011,3:41 PM Project No. Pr ject Tile PLANNED FY 2014 -15 PROJECTS ESTIMATED FUNDING AVAR,ABLE AT JULY 1, 2014 Net Revewe Available for Fiscal Year " "" Total Amount Available for Capial Project Comments 15 -01 1115 Sts acing Program - .- - PWD Yes ADOPTED FY 2011 -12 CAPITAL IMPROVEMENT PROGRAM 80 - 111 - 317 724 57 3,316 88 861 PRDJECT FUNDING SDURCES 15 -02 14 -15 Tr 11 Signal and S- Light Pole Repl IS -03 14- 15 Slurry SW Program - 15 -04 14 -15 Water System lmprovemeNS 15 -05 14 -15 Waaewmer System vement 15 -06 14 -15 Concrete Sidewalk'Curb Repaos 15 -07 14 -15 Parks Pathway Resmfacing _ 15 -06 14 -15 Shoreline Pathway , Road -ay, Parking bup,ovwuenu 15 -09 14 -15 Enre... Mainfmanre Program eM Street Tree Replanti,g 15 -10 11155horeli,e LandBI1C Mair qumice wd 15 -11 10.15 Developer Re ®bmsements PWD PWD PSD PSD PWD CSD CSD CSD PSD PWD No Yea No No Y. No No No No No 204 13 299 29 333 29 149 29 Capital Co. -.i.N 114 184 Sfmm Solid Shorolwe 204 127 Downtown 333 General Fuud: D1h« Fwding 0 Prevailing Improvement Conveyance 184 Waste Drain Nara Gas Regi..]Park Parking Revitalization Perk Lend BuJding Sources 287 402 _ . 126 195 103 34 80 10 86 172 Sponsor Wage Reserve Tex Water Water Constmefion Management Tex Community District Authority DMicatipn Services (See Dept. Project? Fwd Fwd Fund Fwd Fwd Fund Fwd Fwd Fund Funding P-d Fwd Covu -) Totals -16 1,522 966 607 652 56 551 6,068 0 0 0 0 0 10,406 0 1,403 1,687 1,727 28 230 858 4,270 286 838 0 0 107 10,310 -16 2,925 2,653 2,334 680 286 1,409 10,338 0 - 0 0 -0 107 20,716 Comments 15 -01 1115 Sts acing Program - .- - PWD Yes 80 II,823 111 6,971 317 724 57 3,316 88 861 4j95 15 -02 14 -15 Tr 11 Signal and S- Light Pole Repl IS -03 14- 15 Slurry SW Program - 15 -04 14 -15 Water System lmprovemeNS 15 -05 14 -15 Waaewmer System vement 15 -06 14 -15 Concrete Sidewalk'Curb Repaos 15 -07 14 -15 Parks Pathway Resmfacing _ 15 -06 14 -15 Shoreline Pathway , Road -ay, Parking bup,ovwuenu 15 -09 14 -15 Enre... Mainfmanre Program eM Street Tree Replanti,g 15 -10 11155horeli,e LandBI1C Mair qumice wd 15 -11 10.15 Developer Re ®bmsements PWD PWD PSD PSD PWD CSD CSD CSD PSD PWD No Yea No No Y. No No No No No 204 13 299 29 333 29 149 29 29 126 114 184 0 _ _ _ 204 127 $32K vi for the lecem .f8 -12 -edigh, 333 0 149 287 0 78 3j63 184 Net Addition to the CIP 2011 -12 throe h 2014 -15 299 la 116 287 126 -17 1542 14-15 Street Lwe Line wd Legrnd Repahwng 15 -13 14-15 Lmrdfill Gas/Leacbaa Sy- Repairs & Mprovements 1544 1415 EacOities Mainrmm,ma Plan I5-15 14-15 Awual Tmlic S,Wies/NTMP Ira ovements 15 -16 14- 15Mai -,e AgrxmentfmlPBM_ATr_an_sit Cen_ ter 15 -17 Shoreline hlramncame Maintenance _ I5-18 trS walon Tahwbgy Computer Proj «t _ 15 -19 Hi-hl Park Renovetions/Improvcmrna I5-20 Bie,uval Goad Neighbor Frnce Re lacemwt 15 -21 C-, Piet Tewis Cow Resurfacing I5-22 Miscellaneous Water MaWServire Line Replacement 15 -23 Miscellaneous SWn Samtry Sewer Mit,_ Replaceme, _ t 15 -24 TDA 14j «b 15 -25 Hi-I ADA 1 ts m Ciry Facilities 15 -26 Installmi0.,fADA Curb Ramps, Phase X 15 -27 14- 15,ArmaRll4ew �gy Cmmuv�6a _�::: ... --:.:� PWD PSD PSD PWD PWD PSD PASD CSD CSD CSD PWD PWD PWD CM PWD PSD Yes No MD, No No Na No No No No Yes _ Yes T.; TED Yes No _ 287 402 _ . 126 195 103 34 80 10 86 172 126 2,165 126 1,495 _ 126 34 3,997 115 230 34 -� _ _ _ _ -- 57 50 517 126 57 230 S55KReimborsemmt of Ciry Expenxsby7PBMFA_ _ 515 103 34 80 2,165 1,495 60 $50K Seta Urene 86 121 172 Total of Non- Di- li..., Projects 0 2,606 2,653 1,799 29 286 838 620 0 0 0 0 107 8,938 Amount Available for C,W Projects larr Total of bl.disereti -n Equals Amount A,,Alablefor Di,,h,d.., Projects -16 319 0 535 651 0 571 9,719 0 0 0 0 0 11,778 Discretionary Projects Streets and Sidewalks PWD Yes 56 - -- 563 - - - - -_ -- 619 Totalof Discretionary Projects 0 56 0 0 0 0 563 0 0 0 0 0 0 619 TOTAL OF PROJECTS 0 2,662 2,653 1,799 z9 286 1,401 620 0 0 00 107 9,117 ESTIMATED AVAILABLE BALANCES June 30, 2015 -16 263 0 s3s 651 0 8 9,718 0 0 0 0 0 .1,159 Key to Color Coding New Po ject Projects with budgetroduced by 50%ormoie in 1Y2010.11 Adopkd CT "Roll Forward" Project Project with budgetaduced by 25 % in FY2010 -11 Adopt d CIP " "" Ouar year revenues of $800,000♦ peryearin[he Gas Tax Fwdassumethe receipt ofHighwey Users Tar Accow[(fIIITA)fwds tivoughou[the next fowf cal years. Some mall of the Gas Taxfimded projects in the oaferyears will notgo forward ifthis funding is n,naceivM. Adopted FY 2011- 12Cepial Improvement No i Page 5, 9/82011, 3 41 PM Four -Year Total of Pe0ect9 0 II,823 111 6,971 317 1,089 5,350 3,316 88 8 4j95 4R2 4,762 47,852 Balance from Projects to be Closed on June 30, 2011 17 340 1,584 899 0 1 0 0 326 0 0 398 0 0 3j63 Net Addition to the CIP 2011 -12 throe h 2014 -15 -17 11,483 7,667 6,M3 317 1 1,089 5,350 2,990 N 8 3,997 482 4,762 44,289 Key to Color Coding New Po ject Projects with budgetroduced by 50%ormoie in 1Y2010.11 Adopkd CT "Roll Forward" Project Project with budgetaduced by 25 % in FY2010 -11 Adopt d CIP " "" Ouar year revenues of $800,000♦ peryearin[he Gas Tax Fwdassumethe receipt ofHighwey Users Tar Accow[(fIIITA)fwds tivoughou[the next fowf cal years. Some mall of the Gas Taxfimded projects in the oaferyears will notgo forward ifthis funding is n,naceivM. Adopted FY 2011- 12Cepial Improvement No i Page 5, 9/82011, 3 41 PM Attachment 2 Projects to Close All numbers are in thousands (1,000) CIPs closed as of June 30, 2011 Project Number Project Title Sponsor Department Total I Budget Amount Returned to Funding Source(s) 00 -17 Open Space Acquisition Del Medio Area Public Works 2,510 305 01 -26 0- en Space acquisition North California - Central Public Works 2,995 58 03 -31 California/Bryant Parking Structure, Construction Public Works 18,224 0 04 -33 Stevens Creek Trail Ped /Bike Overcrossing at Moffett Public Works 4,900 315 05 -42 Permanents Creek Ped /Bike Overcrossing Highway 101, Design Public Works 1,180 9 05 -44 Devonshire Park Design and Construction Public Works 1,112 14 05 -45 Downtown Infrastructure Refurbishment Public Works 185 0 06 -17 Shoreline Infrastructure Maintenance Public Works 200 0 07 -04 2006 -07 Water System Improvements Public Works 285 4 07 -05 2006 -07 Wastewater System Improvements Public Works 130 13 07 -10 2006 -07 Shoreline Landfill Cap Maintenance and Repairs Public Works 401 0 07 -26 Miscellaneous Water Main /Service Line Re lacement Public Works 1,800 528 07 -27 Miscellaneous Storm/Sanitary Sewer Main Replacement Public Works 1,400 443 07 -29 Biennial Park Innovations/Improvements Comm. Svcs. 125 15 07 -41 Police/Fire Building and Well No. 22 Emergency Generator Public Works 520 16 08 -04 2007 -08 Water System Improvements Public Works 2851 0 08 -10 2007 -08 Shoreline Landfill Cap Maintenance and Repairs Public Works 105 1 08 -13 2007 -08 Landfill Gas/Leachate System Repairs/Improvements Public Works 105 0 08 -20 Biennial Median/Roadway Landscape Comm. Svcs. 80 2 08 -25 Biennial Real Estate Technical and Legal Services Public Works 70 9 08 -32 Miscellaneous Water Main /Service Line Replacement Public Works i'lool 464 08 -33 Miscellaneous Storm/Sanitary Sewer Main Replacement Public Works 1,300 441 08 -34 ,Sierra Vista Park, Construction Public Works 1,033 t6 08 -45 Groundwater Wells Emergency Power Supply Public Works 1,275 582 08 -48 Stierlin Road to Shoreline Blvd. Sidewalk Connector Public Works 75 20 08 -50 l7icricz Drive Bridge Replacement Public Works 6281 0 09 -07 2008 -09 Parks Pathway Resurfacing Comm. Svcs. 95 0 09 -33 Facilities Major/Emergency Repairs Public Works 370 279 09 -38 Installation of ADA Curb Ramps, Phase IV Public Works 110 1 09 -39 Cecilia Way Valley Gutter Reconstruction Public Works 125 4 09 -41 Citywide Benchmark and Monument Program Public Works 70 1 10 -03 2009 -10 Slurry Seal Program Public Works 115 15 I0 -09 2009 -10 Forestry Maintenance Program and Street Tree Replanting Comm, Svcs, 425 6 Total of Closed Projects 42,972 3,563 Page 1 of 1 Attachment 3 Active Projects The projects below were funded in previous years and will remain active after June 30, 2011. Some of the projects are near completion and have low remaining fund balances, but will remain open to make final payments and complete remaining project tasks. All numbers are in thousands (1,000). Project Number Project Title Sponsor Department Total Encumbrances Budget at 6/30/2011 Balance at 6/30/2011 95 -50 Downtown Fagade Improvement Program Comm Dev 221 0 20 00 -49 Downtown Transit Plaza Design and Construction Public Works 3,540 4 61 01 -19 II.S. Computer Projects Finance 415 3 17 02 -30 ADA Renovations/Upgrades Public Works 89 0 3 02 -42 Charleston East Site - Post Marketing Activities Comm. Dev, 1,400 24 12 03 -17 2003 -03 Information Services Computer Projects Finance 1,191 1,019 41 03 -20 Water System Master Plan Public Works 221 0 19 03 -23 Fire Station No. 5 Design Public Works 1,870 162 189 03 -36 New Stormwater Regulations Public Works 100 0 74 04 -19 Shoreline Community Reclaimed Water Feasibility Study Public Works 200 3 119 04 -20 Sewer System Master Plan Public Works 255 53 0 04 -27 Shoreline Maintenance Facility Construction Public Works 6,600 30 467 04 -29 Bubb Park and Huff Park Restrooms Public Works 633 133 125 04 -40 Stevens Creek "frail, Yuba Drive through El Camino Real Public Works 6,806 0 102 05 -22 1 San Antonio Bridge Over Central Expressway Repairs Public Works 1,070 17 254 05 -27 Moffett/U.S. Highway 101 Gateway Development Public Works 200 10 0 05 -39 Recycled Water Distribution System Construction Public Works 8,100 735 3,665 06 -04 2005 -06 Water System Improvements Public Works 284 5 0 06 -25 Facilities Major Planned and Emergency Repairs Public Works 1,920 278 33 06 -27 ADA Improvements at City Facilities Public Works 175 1 21 06 -31 Traffic Signal at Middlefield Road and Logue Avenue Public Works 283 0 6 06 -33 Permanente Creek Ped /Bike Overcrossing Highway 101, Construction Public Works 8,713 4,724 298 06 -37 Downtown Revitalization Bond Improvements Public Works 504 63 145 07 -15 2006 -07 Annual Traffic Studies /NTMP Improvements Public Works 105 1 16 07 -17 Shoreline Infrastructure Maintenance Public Works 200 27 5 07 -18 2006 -07 Information Services Computer Projects Finance 635 44 426 07 -20 SCADA Upgrades and Management Public Works 250 1 13 07 -22 Police /Fire Building Structural and Space Studies Public Works 320 4 1 07 -23 Geographic Information System (GIS) Update /Data Archiving Public Works 597 56 17 07 -34 Community Center HVAC System Public Works 555 470 27 07 -35 Stevens Creek Trail, El Camino Real to Dale /Iicatherstone, Design Public Works 1,200 19 27 07 -36 TDA Projects Public Works 60 1 4 07 -37 lFvelyn Avenue Bridge Widening Mitigation Public Works 180 10 58 07 -38 Library Space Reallocation Public Works 1,945 51 1 07 -42 Police /hire Building Interior Refurbishment Public Works 400 13 48 Page 1 of 6 Active Projects The projects below were funded in previous years and will remain active after June 30, 2011. Some of the projects are near completion and have low remaining fund balances, but will remain open to make final payments and complete remaining project tasks. All numbers are in thousands (1,000). Project Number Project Title Sponsor Department Total Encumbrances Budget at 6/30/2011 Balance at 6/30 /2011 07 -43 Council Chambers Technology Update City Clerk 655 8 95 07 -46 Caltrain Station Parking Deck, Engineering/Environmental Review Public Works 455 361 2 08 -05 2007 -08 Wastewater System Improvements Public Works 130 8 119 08 -14 2007 -08 Facilities Maintenance Plan Public Works 420 40 0 08 -15 2007 -08 Annual Traffic StudieslNTMP Improvements Public Works 51 0 3 08 -17 Shoreline Infrastructure Maintenance Public Works 200 10 156 08 -18 2007 -08 Information Services Computer Projects Finance 732 43 218 08 -21 Athletic Field, Design Public Works 0 0 0 08 -24 Rengstorff Park Fitness Cluster Comm. Svcs. 75 1 17 08 -27 Permancnte Creek Improvements Design (SCVWD) Public Works 75 2 28 08 -28 Rengstorff Underground Utility District #36 Public Works 50 0 0 08 -29 2007 -08 Facilities Major Planned and Emergency Repairs Public Works 225 5 74 08 -31 Replace Street Lights Public Works 230 9 0 08 -35 Restroom Facility at Dog Park Comm. Svcs. 90 65 24 08 -37 Stevens Creek Trail, El Camino Real to Sleeper, Construction Public Works 1,524 8 126 08 -38 Whisman Reservoir Seismic Upgrades Public Works 500 78 195 08 -40 Velarde Street Sidewalk and Driveway Replacement Public Works 180 19 6 08 -41 California Street /Mariposa Avenue Traffic Signal Public Works 201 0 6 08 -42 Grant Road /Sleeper Traffic Signal Project Public Works 75 4 62 08 -43 City Telephone System Replacement Finance 850 111 171 08 -44 Fire Station No. 3 Renovations Public Works 350 31 102 08 -47 Rengstorff /Central Expressway Pedestrian Improvements Public Works 165 9 143 08 -53 Fire Fleet Replacement Finance 4,800 2 16 08 -99 General Plan Comm. Dev. 2,766 679 501 09 -02 2008- 09'I'raffic Signal Replacements/Modifications Public Works 155 5 7 09 -04 2008 -09 Water System Improvements Public Works 300 10 0 09 -05 2008 -09 Wastewater System Improvements Public Works 135 8 123 09 -06 2008 -09 Concrete Sidewalk /Curb Repairs Public Works 365 0 2 09 -08 2008- 09'Shoreline Pathway, Roadway, Parking Improvements Comm. Svcs. 165 5 82 09 -09 2008 -09 Forestry Maintenance Program and Street Tree Replanting Comm. Svcs. 4 t0 3 53 09 -10 2008 -09 Shoreline Landfill Cap Maintenance and Repairs Public Works 115 0 1 09 -13 2008 -09 Landfill Gas /Leachate System Repairs & Improvements Public Works 115 5 0 09.14 2008 -09 Facilities Maintenance Plan Public Works 410 27 24 09 -15 2008 -09 Annual Traffic Studies /NTMP Improvements Public Works 167 8 4 09 -17 Shoreline Infrastructure Maintenance Public Works 205 13 193 Page 2 of 6 Active Proiects The projects below were funded in previous years and will remain active after Jane 30, 2011. Some of the projects are near completion and have low remaining fund balances, but will remain open to make final payments and complete remaining project tasks. All numbers are in thousands (1,000). Project Dumber Project Title Sponsor Department Total Budget Encumbrances at 6/30/2011 Balance at 6/30/2011 09 -18 Information Technology Computer Projects Finance 785 70 115 09 -19 Biennial Park Renovations /Improvements Comm. Svcs. 125 11 95 09 -21 IMiscellancous Water Main/Service Line Replacement Public Works 1,195 944 93 09 -22 Miscellaneous Storm/Sanitary Sewer Main Replacement Public Works 1,325 908 234 09 -23 TDA Projects Public Works 117 16 19 09 -24 Rengstorff Park Master Plan Comm. Svcs. 364 81 26 09 -26 Pormanente Trail Charleston Road Undercrossing Feasibility Study Public Works 200 12 185 09 -27 Mountain View High School Traffic Study Public Works 100 4 0 09 -28 Rengstorff Avenue Grade Separation/High Speed Rail Coordination Public Works 350 108 98 09 -29 NASA -Ames Bayshore Lightrail Station Pedestrian Access Study Comm. Dev. 200 12 178 09 -30 Modification to Alleyway Behind 200 Block of Castro Street Comm, Dev. 50 3 47 09 -31 Castro Street Bomanite Caulking Public Works 237 1 14 09 -32 Fire Station No. 5, Construction Public Works 10,500 4,037 3,811 09 -35 install New Radio System Improvements and Monopole Police 130 27 62 09 -36 Annual ADA Improvements to City Facilities City Mgr. 75 5 70 09 -37 t Shoreline & ECR, Replace Sidewalks, Curbs & Gutters, Design and Const. Public Works 949 76 0 09 -40 Burgoyne Street Reconstruction Public Works 1,227 8 117 09 -43 Shoreline Park Wildlife Management Comm. Svcs. 320 47 129 09 -44 Mariposa/W. Dana Park, Design and Construction Comm. Svcs. 1,412 136 909 09 -45 Gateway Signage Study Comm. Da dPublic Wks 25 1 23 09 -46 San Ramon Avenue Reconstruction Public Works 650 22 585 09 -47 Grant Road Adaptive Signal Project Public Works 468 31 388 09 -48 Pavement Resurfacing - Federal Economic Stimulus Public Works 951 9 133 09 -49 Remove Structures at 380 & 390 Del Medio Public Works 150 21 16 09 -50 Pedestrian Master Plan Project Public Works 125 45 0 09 -51 Acquisition of 263 Escuela Avenue Public Works 3,500 0 143 10 -01 2009 -10 Street Resurfacing Program Public Works 897 9 146 10 -02 2009 -10 Traffic Signal Replacements /Modifications Public Works 155 3 42 10 -04 200 9- 10 Water System Improvements Public Works 300 35 238 10 -05 2009 -10 Wastewater System Improvements Public Works 135 12 115 10 -06 2009 -10 Concrete Sidewalk /Curb Repairs Public Works 520 30 455 10 -07 2009 -10 Parks Pathway Resurfacing Comm. Svcs. 95 7 0 10 -08 2009 -10 Shoreline Pathway, Roadway, Parking Improvements Comm. Svcs. 165 9 145 10 -10 2009 -10 Shoreline Landfill Cap Maintenance and Repairs Public Works 115 1 20 10 -11 2009 -10 Developer Reimbursements Public Works 105 21 72 Page 3 of 6 Active Proiects The projects below were funded in previous years and will remain active after June 30, 2011. Same of the projects are near completion and have low remaining fund balances, but will remain open to make final payments and complete remaining project tasks. All numbers are in thousands (1,000). Project Number Project Title Sponsor Department Total Encumbrances Budget at 6/3012011 Balance at 6/30/2011 10 -12 2009 -10 Street Lane Line and Legend Repainting Public Works 245 1 14 10 -13 2009 -10 Landfill Gas/Leachate System Repairs & Improvements Public Works 79 10 66 10 -14 2009 -10 Facilities Maintenance Plan Public Works 470 70 28 10 -15 2009 -10 Annual Traffic Studies/NTMP Improvements Public Works .95 9 80 10 -16 2009 -10 Maintenance Agreement for JPB /VTA Transit Center Public Works 50 0 41 10 -17 Shoreline Infrastructure Maintenance Public Works 510 310 195 10 -18 Information Technology Computer Projects Finance 506 22 342 10 -19 Biennial Median Renovations and Roadway Landscape Renovations Comm. Svcs. 85 9 46 10 -20 Biennial Good Neighbor Fence (GNF) Replacements Comm, Svcs. 40 2 35 10 -21 Biennial Real Estate Technical and Legal Services Public Works 1 75 3 45 10 -22 Miscellaneous Water Main /Service Line Replacement Public Works 1,222 111 994 10 -23 Miscellaneous Storm/Sanitary Sewer Main Replacement Public Works 1,355 111 1,084 10 -24 TD Projects Public Works 60 22 22 10 -25 Annual ADA Improvements to City Facilities Public Works 80 5 75 10 -26 Installation of ADA Curb Ramps, Phase V Public Works 220 11 176 10 -27 2009 -10 Annual New Energy Conservation Measures Public Works 159 50 34 10-28 California Street Rule 20A Underground Utility District No. 40 Publlc Works 55 3 52 10 -29 Library Automated Materials Handling System, Phase I1, Design & Construction Public Works 255 15 236 10 -30 CPA - Second Stage Support Space Addition, Design Public Works 335 137 41 10 -31 Whisman Reservoir Seismic Upgrades, Construction Public Works 1,800 110 1,690 10 -32 AB 811 Benefit Assessment District Technical Assistance Public Works 100 6 94 10 -33 AB 2466 Renewable Energy Facility Evaluation Public Works l50 7 111 10 -34 Greening the Library Public Works 140 9 131 10 -35 Create Zero Waste Action Plan Public Works 230 60 62 10 -36 Green Building Code Comm Dev 50 11 0 10 -37 Bicycle Boulevard Implementation Public Works 42 0 28 10 -38 Biennial Pavement Maintenance Program (PMP) Recertification Public Works 60 0 6 10 -39 Californi'd/ESCUela, California /Ortega and Whisman /Middlefield Traffic Signal Modifications Public Works 715 310 388 10 -40 North Shoreline Boulevard (in the Park) Storm Drainage Rehabilitation Public Works 887 53 822 10 -41 Del Medio Park, Design and Construction Public Works 1,101 631 283 10 -42 Stevens Creek Trail, Sleeper to Dale/Hcatherstone, Construction Public Works 5,635 2,783 134 10 -44 Shoreline Sailing Lake Dock Repair Comm. Svcs. 40 0 1 10 -45 Rengstorff Neighborhood Capital Needs Assessment Public Works 100 8 78 Page 4 of 6 Active Projects The projects below were funded in previous years and will remain active after June 30, 2011, Some of the projects are near completion and have low remaining fund balances, but will remain open to make final payments and complete remaining project tasks. All numbers are in thousands (1,000). Project Number Project Title Sponsor Department Total Encumbrances Budget at 6/30/2011 Balance at 6/30/2011 10 -47 Moffett Gateway Property - Site Security and Corrective Action Public Works 265 18 159 10 -48 Shoreine Boulevard Sidewalk Replacement Public Works 1,155 69 1,067 10 -49 Project Readiness Initiative Public Works 25 0 3 11 -01 2010 -11 Street Resurfacing Program Public Works 545 31 473 11 -02 2010 -11 Traffic Signal Replacements /Modifications Public Works 210 16 86 11 -03 2010 -11 Slurry Sea] Program Public Works 115 7 101 11 -04 2010 -11 Water System Improvements Public Works 310 19 289 11 -05 2010 -11 Wastewater System Improvements Public Works 140 8 129 11 -06 2010 -11 Concrete Sidewalk/Curb Repairs Public Works 530 37 448 11 -07 2010 -11 Parks Pathway Resurfacing Comm. Svcs. 95 95 0 11 -08 2010 -11 Shoreline Pathway, Roadway, Parking Improvements Comm. Svcs, 170 10 160 11 -09 2010 -11 Forestry Maintenance Program and Street Tree Replanting Comm. Svcs. 265 8 71 11 -10 2010 -11 Shoreline Landfill Cap Maintenance and Repairs Public Works 115 3 53 11 -11 2010 -11 Developer Reimbursements Public Works 105 6 99 11 -12 2010 -11 Street Lane Line and Legend Repainting Public Works 280 41 8 11 -13 2010 -11 Landfill GaslLeachate System Repairs & Improvements Public Works 78 5 70 11 -14 2010 -11 Facilities Maintenance Plan Public Works 505 241 126 11 -15 2010 -11 Annual Traffic Stud ies/NTMP Improvements Public Works 115 26 78 11 -16 2010 -11 Maintenance Agreement for JPB /VTA Transit Center Public Works 55 4 47 11 -17 Shoreline Infrastructure Maintenance Public Works 210 13 197 11 -18 Information Technology Computer Projects Finance 500 31 469 11-19 Biennial Park Renovationsilmprovements Comm: Svcs. 85 5 80 11 -20 Resurface Tennis Courts, RengstorffPark Public Works 75 5 70 11 -21 Miscellaneous Water Main /Service Line Replacement Public Works 1,165 240 900 11 -22 Miscellaneous Storm/Sanitary Sewer Main Replacement Public Works 1,380 211 1,100 11 -23 TDA Projects Public Works 60 4 56 11-24 Biennial ADA Improvements to City Facilities City Mgr. 80 5 75 11 -25 Installation of ADA Curb Ramps, Phase VI Public Works 225 14 211 11 -26 2010 -11 Annual New Energy Conservation Measures Public Works 160 9 146 11-27 Library Space Modifications, Conceptual Design Public Works 150 9 134 11 -28 Fire Station No. 4 Drill Grounds Modification Public Works 145 9 112 11-29 Waste Hauler RFP Public Works 200 162 38 11-30 San Luis Avenue Reconstruction Public Works 570 54 486 11 -31 Vassar Avenue Reconstruction, Design Public Works 180 11 169 11 -32 Castro Street Stair Tread Modification Public Works 412 23 346 Page 5 of 6 Active Projects The projects below were funded in previous years and will remain active after June 30, 2011. Some of the projects are near completion and have low remaining fund balances, but will remain open to make final payments and complete remaining project tasks. All numbers are in thousands (1,000), Project Number Project Title Sponsor Department Total Budget Encumbrances at 6/30/2011 Balance at 6/30/2011 11 -33 Athletic Field, Construction Public Works 10,080 1,066 8,588 U -34 Stevens Creek `frail Landscaping Improvements South of ECR Public Works 93 6 87 11-35 Stevens Creek Trail Access Point Improvements North or ECR Public Works 50 3 47 11 -36 Improvements to Open Space at Bonnie and Beatrice Streets Comm. Svcs, 32 15 16 11 -37 Highway 101 Auxiliary Lanes Coordination Public Works 75 3 49 11 -38 Highway 85 Noise Barrier Study Public Works 200 12 188 Adopted Mid -Year Capital Improvement Projects 11 -39 Church Street Improvements, Castro to Calderon Public Works 785 128 613 11 -40 Acquisition 449 Franklin Street Public Works 3,270 3,010 256 11 -41 Landfill Microturbine Replacement Public Works 558 252 287 11 -42 Michael's Facility Upgrades and Repairs Public Works 460 90 355 11 -43 Vehicle Emissions Reduction VERBS Program Public Works 565 34 531 11 -44 Central Expressway Sidewalks, Gemini Avenue to Moffett Blvd. Public Works 450 0 450 I1 -45 North Bayshore Precise Plan Comm. Dev, 450 0 450 11 -46 Revitalization Authority Projects Comm. Dev. 5,052 0 5,052 Totals 146,335 27,260 50,049 Page 6 of 6 Attachment 4 Summary of Funding Reductions to Annual Projects To present a balanced five -year CIP, planned funding for non - discretionary projects was reduced in the outer four years. All non - discretionary projects were fully funded in the first year, and those not listed below were fully funded in all five years. Concrete Sidewalk/Curb Repairs Funding reduced by 50% in all four outer years Parks Pathway Resurfacing Funding reduced by 25% in all four outer years Street Lane Line and Legend Repainting Fully funded in years 1, 3 & 5 Funding reduced to $50,000 in years 2 & 4 Biennial Park Renovations /Improvements Funding reduced by 25% in years 3 & 5 Biennial Good Neighbor Fence Replacements Funding reduced by 25% in years 2 & 4 Biennial Median & Roadway Landscape Renovations Funding reduced by 25% in years 2 & 4 Annual ADA Improvements to City Facilities Changed to a biennial project; fully funded in years 1, 3 & 5 Installation of ADA Curb Ramps Funding reduced by 50% in all outer years Annual New Energy Conservation Measures Fully funded in years 1, 3 & 5 Funding reduced by 50% in years 2 & 4 Attachment 5 CITY OF MOUNTAIN VIEW MEMORANDUM DATE: April 14, 2011 TO: Michael A. Fuller, Public Works Director FROM: Gregg A. Hosfeldt, Assistant Public Works Director SUBJECT: WATER AND SEWER MASTER PLAN FINDINGS The purpose of this memorandum is to provide an overview of the key findings from the 2010 Water and Sewer System Master Plans and request additional funding for water and sewer capital improvement projects. RECOMMENDATION Increase funding for the Annual Water Main /Service Line Replacements Capital Improvement Project by $250,000 annually for the next five years to fund hydraulic improvements and infrastructure identified as reaching the end of its anticipated useful life. Current Capital Improvement Project funding would increase from $1,165,000 in Fiscal Year 2010 -11 to $1,415,000 in Fiscal Year 2011 -12; $1,665,000 in Fiscal Year 2012 -13; $1,915,000 in Fiscal Year 2013 -14; $2,165,000 in Fiscal Year 2014 -15; and $2,415,000 in Fiscal Year 2015 -16. FISCAL IMPACT The recommended appropriations will increase Water Fund capital improvement project expenses by $250,000 annually for Fiscal Year 2011 -12 through Fiscal Year 2015 -16, BACKGROUND AND ANALYSIS- -WATER SYSTEM MASTER PLAN The City of Mountain View delivers an average of 11 million gallons per day of water to business and residential customers through a distribution system comprised of 172 miles of pipeline, 4 reservoirs, 3 pump stations and 6 groundwater wells. The San Francisco Public Utilities Commission and Santa Clara Valley Water District are the City's primary water suppliers. The City periodically develops master plans to assess the condition of the water system, ensure adequacy of the system to meet existing and future needs, and estimate ongoing and long -terra operation, maintenance and capital costs. The last full review of the Michael A. Fuller April 19, 2011 Page 2 water infrastructure was completed by Camp, Dresser & McKee in 1990. Based on recommendations contained in the 1990 Master Plan, the City initiated and /or completed several major projects to enhance water supply and system reliability: • Completed rehabilitation of the Whisman Pump Station and Mirarnonte Pump Station. • Completed construction of the 2.3 million gallon Miramonte Reservoir No. 2 in 2006. • Completed construction of the 8 million gallon Graham Reservoir and Pump Station in 2007. Replaced and upgraded the Miramonte water transmission main. • Replaced the telemetry system with a SCADA system. • Removed the Bryant Tank. • Completed construction of Well No. 21 (replacement for Well No. 18), Well No. 22 and Well No. Z3. In 2D06, the City contracted with Infrastructure Engineering Corporation (IEC) to complete a new master plan and develop recommendations and cost estimates for improving, maintaining and maximizing the life of water system assets. The Master Plan included: A review of hydraulic capacity to ensure the distribution system can supply adequate water to meet peak hour demand and maximum day with fire flow demand, and a condition assessment of the system to identify pipelines nearing the end of their anticipated useful life. A review of the seismic vulnerability of the water system to identify current deficiencies and develop recommendations for rehabilitation. A condition assessment of the wells, pump stations and reservoirs to identify rehabilitation and repair needs. Michael A. Fuller April 14, 2011 Page 3 The recommendations from the Master Plan establish a strategy for investing in the water distribution system for the next 20 years. The major findings and recommendations from the Master Plan are summarized below. FINDINGS AND RECOMMENDATIONS The hydraulic analysis shows the water distribution system generally performs well and meets design criteria during maximum day and peak hour conditions, However, during maximum day plus fire flow conditions, approximately 1.5 percent of the locations contained in the hydraulic model do not maintain adequate pressure. The distribution system assessment included an'analysis of pipeline age, material and surrounding soil condition as a basis for developing an estimate of the remaining life of each pipe segment. The assessment also included an analysis of the severity of water service impact from a failure and the difficulty of repairing the failure (e.g., a failure under the railroad right -of -way or the highway can be difficult and costly to identify and repair, and can cause long service disruptions). Based on these factors, IEC assigned a replacement priority for each pipeline and developed a cost estimate for replacing pipelines assumed to be reaching the end of their useful life. IEC Recommendation: IEC recommends completing hydraulic replacements as high priority (next five years) to correct existing fire flow deficiencies. The total estimated cost to address the deficiencies is $4,600,000 (annual cost of $920,000). IEC also recommends investing an additional $7,140,000 during the next five years (annual cost of $1,428,000) and $2,400,000 annually through 2030 to replace aging pipes. The seismic vulnerability assessment includes a list of recommended improvements, including securing equipment at City water facilities and upgrading the roofs at Miramonte Reservoir and Whisman Reservoirs. The Whisman Reservoir roof upgrade is already funded and in design. Recommended improvements also include upgrading and adding water system connections with the SFPUC at the City of Sunnyvale, the City of Palo Alto and the Santa Clara Valley Water District. The list of improvements is included as Attachment 1, Increasing the number and size of interconnections with other regional water systems will improve Mountain View's ability to maintain a water supply during local or regional emergencies, but these improvements are considered medium priorities. Michael A. Fuller April 14, 2011 Page 4 IEC Recommendation; Add funding for High - Priority 1 seismic improvements ($7,000); add funding for Priority 2 improvements ($2,236,000) to the 10 -year CIP plan and complete Priority 3 improvements ($4,118,000) by 2030. The assessment of distribution system facilities, including pump stations, reservoirs and wells, identified funding recommendations for future pump station replacements and rehabilitation of two wells. IEC Recommendation: The Master Plan includes estimated annual investments necessary to maintain these facilities in good condition. Recommended projects include rehabilitation of two wells in the next five years and additional investments to maintain pump stations and reservoirs. The recommended investment is based on estimated annual depreciation of the infrastructure, but no specific pump station and reservoir improvements are indicated at this time. Staff Recommendations: The total recommended investment in the water distribution infrastructure is summarized in Attachment 2. Staff reviewed the detailed list of recommended hydraulic replacements and identified several pipelines already replaced or included in upcoming projects. After removing completed or scheduled projects, total funding of $11,740,000 ($2,348,000 annually) is needed to complete hydraulic and condition replacement projects in the next five years. The Annual Water Main /Service Line Replacement CIP is currently funded with $1,165,000, leaving an annual funding shortage of $1,183,000, As noted, IEC's recommendations for annual infrastructure investment is based on pipeline age and estimated life, pipeline material, surrounding soil conditions and the impact and difficulty of repairing a failure. An additional indicator of the need for investment is the frequency of water system failures (main, saddle and service breaks). Attachment 3 illustrates the history of failures since 1990, as well as the City's annual investment in infrastructure replacement. Although the frequency of failures has been relatively low since 2000, 44 percent of the City's 172 miles of pipeline have reached 75 percent of their anticipated useful life. The Annual Water Main /Service Line. Replacement CIP includes funding adequate to replace only one mile of pipeline; this level of investment is inadequate to maintain a low number of failures. In light of Water Fund financial concerns and the low number of water system failures, staff does not recommend fully funding all capital investments recommended in the Master Plan immediately. Staff is also very cognizant of the need to maintain a strong replacement program and, based on IEC's recommendations to replace aging infrastructure, recommends increasing funding in the Annual Water Main /Service Line Replacements Capital Improvement Project by $250,000 annually for the next five fiscal years for a total project budget of $2,415,000 in Fiscal Year 2015 -16. The increases will Michael A. Fuller April 1 4, 2011 Page 5 fund replacement of all pipelines with hydraulic deficiencies and provide the recommended project funding for ongoing replacement (through 2030) of pipelines identified as reaching the end of their anticipated life. Future Funding Needs The additional funding for the Annual Water Main /Service Line Replacements Capital Improvement Project will address hydraulic deficiencies and annual replacement of aging pipeline, but will not be adequate to address seismic improvements and maintenance and replacement of wells, pump stations and reservoirs. Staff believes adequate funding is available in existing CIPs to complete high - priority seismic projects and develop a scope of work and schedule for Priority 2 and Priority 3 projects. Additionally, some of the recommended Priority 2 and Priority 3 projects may be completed through developments and other capital .improvement work. Staff will review the list of long -term seismic work and develop project recommendations and schedules in the next 12 to 18 months. Staff concurs with the recommendation to rehabilitate two wells and will develop project construction schedules. Additionally, based on the Master Plan finding that no specific pump station and reservoir improvements are recommended at this time, staff is not requesting additional financial resources for rehabilitating these facilities, but will continue to monitor conditions and request funding as needs arise. SEWER SYSTEM MASTER PLAN — BACKGROUND AND ANALYSIS The City's sanitary sewer system collects and transfers approximately 9 million gallons of wastewater per day to the Palo Alto Regional Water Quality Control Plant for treatment. The sewer system is comprised of 157 miles of pipe and 2 lift stations. The City periodically develops a master plan of the sewer infrastructure to assess the condition of the system; the capacity to meet existing and future flows; and estimate ongoing and long -term operation, maintenance and capital costs. The last full sewer system review was completed by CH2M Hill in 1991. In 2006, the City contracted with Infrastructure Engineering Corporation (IEC) to complete a new master plan and develop recommendations and cost estimates for improving and maintaining the system and maximizing the life of sewer system assets. The Master Plan included a review of two major aspects of the sewer system: A hydraulic review to ensure the collection system has adequate capacity for current needs and future anticipated developments. Michael A. Fuller April 14, 2011 Page 6 A condition replacement assessment to establish monitoring and replacement priorities that will help the City replace deteriorating assets in a timely fashion to maintain a functioning collection system. The recommendations from the Master Plan are designed to establish a plan for the City's investment in the wastewater collection system for the next 20 years. The major findings and recommendations from the Master Plan are summarized below. FINDINGS AND RECOMMENDATIONS The hydraulic analysis shows the City's wastewater collection system generally performs well and meets design criteria. However, approximately 4 percent of system pipes have insufficient capacity for existing or anticipated flows. The Master Plan includes recommendations to replace pipes with insufficient capacity. The Master Plan does not include projected sewer flows from the anticipated NASA development. IEC is updating the sewer model to include the additional flows and identify necessary upgrades. IEC Recommendation: Replace pipeline where current or anticipated capacity is inadequate. -The total cost of these replacements is estimated to be $4,473,000 during the next 20 years. The condition analysis produced a list of recommended pipe replacements based on anticipated useful life; maintenance priority rating; the corrosivity of the surrounding soil; the potential size of a spill from a failure and the difficulty of locating, repairing and remediating the failure (e.g., a pipeline failure under the railroad right -of -way or the highway can be difficult to contain and repair, and can result in larger spills and damages). IEC Recommendation: Replace 105 sections of pipeline at an estimated cost of $14,898,000 by 2030. Pump equipment at the Sewage Pump Station should be upgraded to improve operations during power failures. The upgrades would include installation of variable frequency drives, replacement of pumps and installation of a system to switch pumps to emergency power in the event PG &E service is lost, as well as miner equipment rehabilitation. IEC Recommendation: Complete Sewage Pump Station upgrades and repairs in the next five years. The total cost of the recommended work is $468,000. F Michael A. Fuller April 14, 2011 Page 7 Staff Recommendations; The recommended investment in the wastewater collection infrastructure is summarized in Attachment 4. Total funding of $6,655,000 ($1,331,000 annually) is needed to complete recommended hydraulic and condition improvement projects in the next five years, and the Annual Sewer Main /Service Line Replacement CIP is currently funded with $1,380,000. Staff does not believe a funding increase is necessary at this time, although there may be additional pipeline replacements recommended as the sewer system model is updated to reflect upcoming large development projects. The current level of funding is also adequate to cover the long- term costs of recommended condition improvement replacements. The Master Plan also includes a recommendation to add funding of $468,000 for Sewage Pump Station variable frequency drive (VFD) replacements and operation upgrades to maintain reliable operation during power failures and to replace corrosion- resistant coating on exposed piping. Staff believes the current equipment configuration provides reliable backup and is recommending replacing one VFD a'nd related'equipment, performing upgrades to ensure seamless facility operation in a power failure and replacing coatings at a total cost of $150,000. There is adequate funding in existing CIPs to complete these upgrades. a. Jqj_� �� V'4 � Gregg A. Hosfeldt Assistant Public Works Director GAH /5 /PSD 761= 04- 04- 11M -E "' Attachments: 1. Recommended Water System Seismic Improvements Z. Recommended Water System Infrastructure Improvements 3. History of Water System Failures and Water Main Replacement Capital Investments 4. Recommended Wastewater System Infrastructure Improvements Recommended Water System Seismic Improvements ?Vn: 4 j. ,TAP . 30. t proy, I Hazards $50,000 $50,000 2 Analysis $50,000 $50,000 3 Restrain fluoridation equipment $20,000 4 Emergency plans $30,000 $30,000 5 Bypass flex hose $300,000 6 Upgrade Whisman roof In process 7 Upgrade Miramonte roof $150,000 8, Improve valve vaults $10,000 $10,000 9 Restrain emergency generators $4,000 $4,000 $4,000 10 New interconnect with Palo Alto $318,000 $318,000 11 Upgraded interconnect with Sunnyvale 1 SFPUC at turnout 48 $798,000 $1,998,000 12, SCVNM direct connection $388,000 131 Allowance $3,000 $676,000 $800, TOTAL $7,000 $2,236,000 $4,118,000 Attachment 1 Recommended Water System Infrastructure Improvements aClH }!�Y() 2�5ri i� �Z� 2�Q�� TptaY r Hydraulic pipeline improvements $4,600,000 $0 $0 $4,600,000 Groundwater well improvements $800,000 $800,000 $0 $1,600,000 Seismic improvements $7,000 $2,236,000 $4,118,000 $6,361,000 Pipeline condition improvements $7,140,000 $12,000,000 $24,000;000 $43,140,000 Pump Station / Reservoir improvements $2,000,000 $2,000,000 $4,000,000 $8,000,000 TOTAL 514,547,000 $17,036,000 $32,118,000 $63,701,000 Note: Some seismic and pipeline condition improvements may be funded through private development projects Attachx 12 40 35 30 25 20 15 10 5 0 qo qti q� q� q� qh qb q^ q� qq po p� o`y o"' o�` oh pb o^ p`b oq ,moo .q tiq 1q �� tiq �q �q �q �� ,q rVp eye r� M b a� E Recommended Wastewater System Infrastructure Improvements 2010 b d lr`iineframe 2035 f Recommended Pipe Hydraulic Improvements $2,752,000 $428,000 $o $1,293,000 $4,473,000 Recommended Pipe Condition Replacements $3,903,000 $3,665,000 $7,330,000 $0 $14,898,000 Recommended Lift Station Repairs $468,000 $o $0 $0 $468,000 =TOTAL $7,123,000 $4,093,000 $7,330,000 $1,293,000 $19,83 Affachme Attachment 6 CITY OF MOUNTAIN VIEW MEMORANDUM DATE: March 28, 2011 TO: Michael A. Fuller, Public Works Director Linda Forsberg, Business and Internal Services Manager FROM: Patty J. Kong, Finance and Administrative Services Director Steve Rodriguez, Information Technology Manager SUBJECT: CAPITAL IMPROVEMENT PROJECT REQUESTS FOR FISCAL YEAR 2011 -12 PURPOSE This memo transmits the Capital Improvement Project (CIP) requests for the Finance and Administratve`Services Department (FASD) for Fiscal Year (FY) 2011 -12. BACKGROUND Information Technology (IT) CIPs are identified as a single project, but will generally consist of subprojects: Proposals for FY 2011 -12 are as follows: Ma a ement A enda Processin 160,000 The City does not currently have an Agenda Processing Management System. The automation of the agenda packet process will streamline the legislative process by reducing paper and staff time involved in the process from data entry to seamless public access on-the web. Although the City currently has a document imaging . program, the program should be reviewed in terms of its functionality and compatibility with all City -wide records requirements, as well as the proposed automated agenda program. In light of the current economic situation, efficiency in all operational areas should be addressed. The records management component allows for the proper retention, archiving and ease of retrieval, creating a self- service records depository in a user - friendly, intuitive environment. Michael A. Fuller Linda Forsberg March 28, 2011 Page 2 Information Technology Strategic Plan — $80,000 It has been several years since the City has undertaken the development or update of an Information Technology (IT) Strategic Plan. As one of the Council's goals for the current fiscal year, the Council adopted an IT Strategic Plan focused on the interactions of the community and residents with City Hall. This Council project is moving forward and is.anticipated to be complete by the end of the fiscal year. That project is also viewed as more focused on external - facing IT and is considered to be a component of the full strategic plan that is proposed. GIS Update — $85,000 The City's GIS system requires software updates to continue the goal of upgrading the system to an Enterprise -level system that can be utilized City -wide. This subproject provides for the various updates that will be needed to upgrade to the latest version of the ESRI product suite which will: Provide a centralized, secure, multi -user system; Implement data- sharing capabilities to allow for GIS data integration into all City applications, and Provide the foundation for the GIS data update project currently under way. This subproject funding will also address any remaining missing or outdated data issues to bring the system up -to -date with all available City data as is required for several projects, including the currently in process new Permit Tracking System project as well as the public safety CAD /RMS system upgrade that will be launched in the near future. Network Backbone U,p, ra&=4107,00a This project will update the link between City Hall and the Police /Fire Administration Building. Since these two buildings are considered the two main transport hubs for the City data and phone network, it is imperative that these two data centers have as much bandwidth between them as possible. Again, this upgrade will make .future upgrades possible such as site -to -site replication for disaster recovery, virtual server mobility between sites and a stable transport network for all City data that has to cross from site to site. Michael A. Fuller Linda Forsberg March 28, 2011 Page 3 Virtual Desktop Infrastructure (VDT) Project-- $53,000 The virtualization of servers has allowed the City to reduce the number of servers required to be purchased and maintained, thereby reducing costs. The virtualization of desktops is a similar concept to the virtualization of servers. VDI would eliminate the need for each individual desktop, with the applications and files being run on servers. This project will allow staff to - develop a pilot program for the VDT project. Research to implement a VDI solution on a small scale will be done to test our ability to move to this type of technology. This project will include a new server, the software and a few test devices. Once testing is completed, this pilot project will determine whether or not this is an option for the City and will assist in developing the RFP for the project in FY 2012.13, if applicable. Digital Imaging Prg ect— $460,000 The City is required by State law to keep all building permit records and copies of approved plans, Currently, the Building Division keeps all recorded documents in the form of microfiche. Current microfiche documents date from the 1950s to 2010. This project would be the initial step to convert the existing records to a digitized format. Digitized records can currently be viewed thKough the Building Division's BMI Imaging Software product. A larger, more comprehensive City -wide records management system is envisioned for the future that may be identified as part of the IT Strategic Plan. A new records management system would have search capabilities and allow official City public records, as well as department documents, to be easily stored and accessed. This project will be the precursor to a City -wide project to convert and store records in a digitized format. Transfer Existing Funding Project 10- 18 (07), CDD Management, was created to establish initial funding for the Permit Tracking System with funding of $75,000. This funding has not been utilized and should be transferred to the existing larger Permit Tracking System, Project 11 -18. SUMMARY The projects proposed are in line with the annual funding identified for annual IT projects. In addition, funding for one existing project is being requested to be transferred. and combined into anther existing project. One additional project fully funded by Building Services is also requested to be funded. A summary of the allocation for the subprojects is attached. Michael A. Puller Linda Porsberg March 28, 2011 Page 4 Please let me know if you need additional information or have questions. Prepared by: 14 Steve Rodriguez Information Technology Manager PJK -SR /5 /FIN 546- 03- 28 -11MA Attachment fl Patty J. Ko-Rg--1 Finance and Adminis Services Director G F .. q IT CIPs FY 2011 -12 Allocation Document Management /Agenda Processing (1) IT Strategic Plan (2) GIS Update (3) Network Back Bone Upgrade (2 VDI Project (Desktop) (4) . Revitali- CCT Gas Tax Water WW SW SRPC SGL Building zaiion Total 120,000 2,000 8,000 3,000 1,000 13,000 1,000 4,000 5,000 150,040 40,000 8,000 8,000 2,000 16,000 2,000 4,000 80,000 34,000 17,000 17,000 - 9,000 -- 8,000 - 85,000 54,000 11,000 11,000 3,000 21,000 2,000 8,000 107,000 40,000 3,000 2,000 2,000 3,000 2,000 1,000 33,000 288,000 2,000 47,000 41,000 8,000 62,000 7,000 22,000 8,000 485,000 485,000 1) based on percentage of items by fund on agenda 2) based on percentage determined by benefit and use 3) based on percentage determined by benefit and use 4) based on number of employees by fund Agenda Processing 74.8% 1.3% 4.8% 1.71/1a 0.9% 8.4%, 0 -8% 2.3% 5.1% 100.0% General IT allocation 50.0% 0.0% 10.0% 10.0% 3.0% 20.0% 2.4 °/fl 5.0% 0.0% 100.010/0 GIS allocation 40.0% 0.0% 20.0% 20.0% 0.0% 11.0% 0.0% 9.0% 0.0% 100.0% Positions 75.5% 0.0% 6.5% 3.9% 2.8% 5 -3% 3.4% 210/, 0.48/6 100.0% CIP 2011- 12.xls 3/25/2011 Attachment 7 CITY OF MOUNTAIN VIEW MEMORANDUM DATE: April 14, 2011 TO: Michael A. Fuller, Public Works Director FROM: Linda Forsberg, Business and Internal Services Manager SUBJECT: CAPITAL IMPROVEMENT PROGRAM - FUNDED ENERGY CONSERVATION PROJECTS This memorandum provides an overview of projects and activities funded from annual energy conservation Capital Improvement Projects (CIPs) since the first project was established in FY 2008 -09. Annual Project Projects /Activities Annual Savings Project 09 -34 • Mountain View Public Library Garage -- 14,379 kWh ($150,000) Replace forty -six 100 -watt metal halide fixtures 9.9 metric tons with LED bi -level fixtures to improve lighting COz reductions* levels and energy efficiency ($4$,500). Metal $2,100 energy halide lights were problematic/ expensive to savings maintain because of short life expectancy and accelerated lighting degradation. $886 PG &E financial incentive received. • Bryant Street Parking Structure — Replace One 52,809 kWh Hundred Five 150 -watt high pressure sodium 36.5 metric tons (HPS) fixtures with LED bi -level fixtures COz reductions* ($131,500). $2,775 PG &E financial incentive $7,900 energy received. savings Additional project costs ($30,000) were paid from other Facilities CIPs. * Based on Environmental Protection Agency (EPA) Greenhouse Gas Equivalencies Calculator City Council April 14, 2011 Page 2 Annual Project Projects /Activities Annual Savings Project 10 -27 Eagle Park— Retrofit twenty -four 100 -watt 10,446 kWh ($155,000) high - pressure sodium (HPS) lamps; Pioneer 7.2 metric tons Park— Retrofit eleven 70 -watt HPS lamps; COz reductions* Centennial Plaza --- Retrofit twenty -four $1,500 energy 70 -watt HPS lamps to improve lighting levels savings and energy efficiency ($9,500). • Civic Center — Replace antiquated lighting 71,335 kWh control systems with new control system 49.3 metric tons ($45,000). $3,566 PG &E financial incentive COz reductions' received. $10,700 energy savings • Castro Street /downtown --- Retrofit four kWh, carbon hundred sixty 70 -watt and 100 -watt HPS post- dioxide emission, top lights throughout the downtown area with reductions and three hundred sixty 40 -watt and one hundred energy cost 85 -watt induction lighting to improve energy savings to be efficiency and provide a uniform lighting effect determined all along Castro, Hope and Franklin Streets pending final from El Camino Real to Evelyn Avenue and decision on throughout the Revitalization District lighting product ($22,320). Project costs for improvements to be installed. within the Revitalization District will be paid from Downtown Bond Proceeds ($37,320). Anticipated completion in late spring 2011. • Technical/ structural analyses to evaluate and identify City facilities that are candidates for solar photovoltaic installations ($23,000), • Technical assistance related to solar photo- voltaic systems being installed on the Shoreline Maintenance Facility and Golf Pro Shop as the result of the City's participation in the regional power purchase agreement (PPA). Installation expected in fall 2011 ($6,000). Based on Environmental Protection Agency (EPA) Greenhouse Gas Equivalencies Calculator City Council April 14, 2011 Page 3 Annual Project Projects /Activities Annual Savings Project 10 -27 California Solar Initiative (CSI) application fees ($155,000) for Shoreline Maintenance Facility and Golf (continued) Pro Shop solar photovoltaic projects ($6,250). Miscellaneous lighting replacement and other energy conservation projects throughout the City ($42,900). Project 11 -26 No activity to date. Still completing Project 10 -27 ($160,000) and Federally funded tasks/ activities (see below). Candidate projects include: • Relamping Civic Center garage with energy - efficient lighting. • Replacing incandescent lighting in City warehouse facility with energy - efficient lighting. • Relamping pool deck lighting at Eagle and Rengstorff Pools. • Exterior lighting improvements at the Municipal Operations Center. In addition to using CIP funds to pay for energy conservation projects, staff has taken advantage of Federal grant funding opportunities to pay for energy conservation projects throughout the City, including: Energy - efficient lighting improvements funded with Federal Community Development Block Grant (CDBG) moneys were installed throughout much of Rengstroff Parkin 2010. The project included new energy - efficient overhead and pathway lighting in the park, new interior and exterior lighting at the Community Center, and new lighting in both the Cprrununity Center and Senior Center parking lots. The cost of the lighting materials was approximately $25,250 and was paid for out of CDBG funds. A $11,000 PG &E financial incentive was received for the project, City Council April 14, 2011 Page 4 bringing the final material costs of the project to $14,220. Installation was done by City staff (also funded with CDBG money). The estimated annual energy cost savings for this project is $12,900. The estimated annual kWh savings is 73,351. The estimated reduction in carbon dioxide emissions is 50.7 metric tons per year. Federal Energy Efficiency and Conservation Block Grant (EECBG) moneys are being used to pay for new energy - efficient lighting at the Cuesta and Rengstorff Tennis Centers. Staff is still identifying the proper induction retrofit kit to install to achieve the desired lighting level. Annual savings generated from the project (kWh, carbon dioxide emission reductions, energy costs) will be calculated once the retrofit kit is finalized. Installation is scheduled to take place during summer 201L Staff continues to identify additional opportunities for energy conservation and implement them in facilities throughout the City. Staff will.continue to seek out additional opportunities to pay for energy conservation projects through non -City funding sources (e.g., Federal grants) and actively pursue financial incentives from PG &E to reduce City costs of implementing energy conservation measures. Linda Forsberg Business and Internal Services Manager LF /S /PSD 701- -04- 14- 11A -E^ f